2-35
Box PC 820 / PC FI45 V2, Manual
A5E00051531-03
2.11.4
Watchdog (WD)
Function
The watchdog monitors the program execution. The watchdog has the task of
informing the user about different reactions to a program crash.
When you switch on your PC, or when you execute a cold restart (HW RESET) the
watchdog remains in its quiet state, that means that it does not trigger any reaction
and the RUN LEDs remain dark. If the watchdog is actve, this is indicated by the green
RUN LED (via driver or SOM program).
Watchdog Reactions
If the watchdog is not triggered within a preset time interval (by driver or SOM
program), the following reactions occur:
Reaction
Option
RUN LED changes from GREEN to RED
always
Canceling WD
always
Initiating of PC reset
can be set
Transmitting IRQ to PC
can be set
Reactions can be configured with the driver or SOM program.
Watchdog Monitoring Times TWD
Monitoring times are set in steps (from 3 to 255) in the configuration register.
Note
If you modify the WD time after the Watchdog has been activated (that is, during
Watchdog execution), the Watchdog is retriggered!
2.11.5
SW Interfaces
Overview
The monitoring function can be called up by driver or SOM program. The included
driver and the functions of the SOM program are described in the documentation.
You can find this documentation on the included CD Documentation and Drivers.
Motherboard
StockCheck.com
Summary of Contents for SIMATIC Box PC 820
Page 166: ...9 4 Box PC 820 PC FI45 V2 Manual A5E00051531 03 CD ROM Drive S t o c k C h e c k c o m ...
Page 174: ...11 6 Box PC 820 PC FI45 V2 Manual A5E00051531 03 Connecting Cables S t o c k C h e c k c o m ...
Page 192: ...Glossary 14 Box PC 820 PC FI45 V2 Manual A5E00051531 03 Glossaryx S t o c k C h e c k c o m ...
Page 196: ...Index 4 Box PC 820 PC FI45 V2 Manual A5E00051531 03 Index S t o c k C h e c k c o m ...