Maintenance and service
9.2 Maintenance plan
SICHARGE D
Operating Instructions, 02/2021, 8EM5907-0AA00-1AA7.01
91
9.2
Maintenance plan
The following maintenance measures are required to maintain the functionality and
operational safety of the charging station.
Times of testing
After commissioning, carry out the tests at the following intervals:
•
6 months after commissioning
•
12 months after commissioning
After the first year, carry out the tests every 12 months. Run the tests at shorter intervals if
required by the ambient conditions of the SICHARGE D charging station.