Siemens S3VA41TDHD Installation Instructions Download Page 2

Installation Instructions

The following instructions are for the installation of 

Siemens Type 3VA41 (SEAB, MEAB or HEAB) 

or

        

Type xGB

 (

NGB

HGB

 or 

LGB

)  2-pole  breakers  as  branch  devices  in  a  Distribution  Switchboard  or                   

P5 Panelboard.  The parts provided in this kit connect 

Type 3VA41 

or

 xGB 

2-pole

 

breakers to a 3-phase, 3 or 

4-wire system.  It is for Type P5 (deep) or Distribution Switchboard  installations.  This kit requires 7.5” of unit 

space.

               

NOTE:

  

The breakers are NOT included in this kit and must be purchased separately.  

11-B-1058-01 Rev. 00

-3-

-2-

DANGER

Hazardous voltage.

Will cause death or

serious injury.

Keep out.

Qualified personnel only.

Disconnect and lock off all

power before working on 

this equipment.

1.  

Lock off power supplying this equipment

     before working on it.

6.  

Refer to Figure 3

     Locate a 0.228” diameter hole in the left Z-rail

     1.88” below the top of the empty unit space

     selected.  Insert two 1/4”-20 x 3/8” screw (Item 14)

     through the barrier support bracket (Item 5)

     mounting holes and into the selected holes in the

     Z-rail (orienting the bracket as shown).  Repeat

     this for the second mounting bracket onto the

     right-side Z-rail.  Tighten these four screws

     (Item 14).  

3.  

Refer to Figure 2

     To mount a Siemens Type 3VA41 or xGB circuit

     breaker, 7.5” of empty unit space is required.

     To locate the proper mounting position, measure

     from the top deadfront support to the intended

     location of the empty unit space (filler) on the

     deadfront.  Transfer this dimension from the

     deadfront support along the Z-rail and mark.

     This will be the unit space (as shown in Figures

     3 & 4).  After marking the Z-rail, remove the

     deadfront rails.

4.  If an existing branch module occupies the

     same location chosen for this kit, remove all of

     its devices, components and parts.

INSTALLING THE RUNBACKS

7.  

Refer to Figure 4

     Locate a 0.228” diameter hole in the A-phase

     bus 1.25” down from the top of the 7.5” empty

     unit space selected.  Insert (2) 1/4”-20 screws (see

     mounting hardware kit instructions located in Item 11

     for the proper length) through the two mounting

     holes in the A/C runback (Item 1) and into the (2)

     selected holes in the A-phase bus (orienting the

     A/C strap as shown) and tighten.  Repeat this step

     to mount the second runback to the C-phase bus,

     this time 2.5” from the top.  For the B-phase,

     insert a 1/4”-20 screw (from Item 11) through the 

     mounting hole in the top B-phase runback (Item 3)

     and into the proper 0.228” hole located in the

     B-phase bus, 2.5” down from the top of the 7.5”

     empty unit space (orienting the B-phase runback as

     shown) and tighten.  Mount the second B-phase

     runback (Item 3) in similar fashion, this time with the

     1/4“-20 screw (Item 11) 1.25” from the bottom of the

     7.5“ empty unit space.  Torque the 1/4”-20 screws

     as specified on the rear of the deadfront. 

INSTALLING THE MOUNTING BRACKETS

10.  

Refer to Figure 6 and Figure 6A

       Orient the breaker so that the breaker stabs are

       to the inside, and align the bottom of the Type 

       3VA41 or xGB breaker with the top of the barrier.

       Slide the breaker along until the notch on the

       bottom of the breaker fully engages the edge of

       the barrier.  Once fully engaged, use

       #10-24 x 5/8” screws (Item 13) to secure each of

       the breaker pole stabs to the properly aligned

       straps.  Torque all hardware as specified on the

       rear of the deadfront.

INSTALLING THE SIEMENS BREAKER

9.  

Refer to Figure 5

     To install the first B-phase strap (Item 4), locate it

     in the center opening of the top barrier such that

     the center hole lines up with the mounting hole on

     the top B-phase runback.  Drive a 1/4“-20 x 5/8”

     screw (Item 15) thru the strap and into the runback

     and tighten.  Repeat this for the other B-phase

     strap to mount it to the lower barrier.  For the 

     A & C-phase straps (Item 2), take one and angle

     the mounting side through the corresponding hole

     in the barrier such that the strap mounting hole

     aligns with the appropriate hole in the A-phase

     runback.  Drive a 1/4”-20 x 5/8” screw (Item 15) 

     through the strap and into the runback and tighten.

     Similar, but opposite, for the C-phase strap.  Then

     repeat for the A / C-phase strap installation into

     the other barrier.  Torque the 1/4”-20 screws as

     specified on the rear of the deadfront.

     

INSTALLING THE STRAPS

2.  

Refer to Figure 1

     Remove the gutter covers and cover plates.

5.  Open the shipping box and inspect the contents.

Figure 6

THIS KIT CONTAINS THE FOLLOWING ITEMS:

**    Application dictates amount of these components used.

***   This sub-kit of parts is packaged in a bag labeled “Standard

       Bus Hardware Kit”.  It includes an instruction card and

       Qty. 18 of fasteners (three different lengths).  Select the

       six required per the instruction card and discard the rest.

****  Required when used with Switchboard Distribution

        application only.

ITEM

DESCRIPTION

QTY

1

2

3

4

5

6

7

8

9

10

Circuit ID Card

#10-24 x 5/8” Socket Head Cap Screw

Card Holder

B-phase Strap

B-phase Runback

A/C-phase Strap

7.5” Cover Plate

1

4

2

2

12

4

12

12

11

12

Barrier Support Bracket

1/4”-20 x 5/8” Hex Head Washer Screw ** 10

2

13

14

Blank Filler **

12

15

16 #8-32 x 5/8” Hex Head Washer Screw

1/4”-20 x 3/8” Hex Head Washer Screw

6

4

#10-24 x 3/8” Hex Head Washer Screw

Bus Hardware Kit, Strap to Section ***

1

A/C-phase Runback

2

Top Barrier

2

Branch Neutral Connector ****

2

17

18 Branch Neutral Terminal Strip

2

Figure 1

Figure 2

COVER

PLATES

GUTTER

COVERS

Z-RAIL

DEADFRONT

SUPPORTS

DEADFRONT

RAIL

8.  

Refer to Figure 5

     Set the top barriers (Item 6) over the two barrier

     support brackets (Item 5) such that the barrier 

     mounting holes align with the holes on the brackets.

     Insert a #10-24 x 3/8” screw (Item 12) on each

     side of each barrier and tighten.

INSTALLING THE BARRIER

Figure 6a

BREAKER

NOTCH

ENGAGEMENT

6

BREAKER

LINE STAB

BREAKER

BASE NOTCH

13

BREAKER

( 3VA41 shown )

Figure 3

Z-RAIL

7.5”

UNIT

SPACE

1.88”

5

14

3.12”

Figure 4

1.25”

1

3

11

(Figure shows three-phase installation.)

7.5”

UNIT

SPACE

2.5”

1.25”

4.31”

4.31”

Figure 5

3

1 5

6

2

4

13

15

12

8

9

10

14

7

(more instructions on following page)