![Siemens P1 BIM Installation Instructions Download Page 3](http://html.mh-extra.com/html/siemens/p1-bim/p1-bim_installation-instructions_377280003.webp)
Document No. 553-140
Installation Instructions
November 4, 2019
Siemens Industry, Inc.
Page 3 of 4
Basic Steps for Connecting Devices to the
DIN Rail
The island bus establishes its own connection when
TX-I/O devices are plugged into one another on a DIN
rail.
1.
Slide out the mounting tabs.
2.
Align the channel on the back of the device with
the DIN rail.
3.
Using a flat blade screwdriver, push in each
mounting tab until it clips onto the DIN rail.
4.
Align an I/O module with the Power Supply or Bus
Connection Module and slide the I/O module
down over the TX-I/O island bus connector.
5.
Push in each mounting tab until it clips onto the
DIN rail.
Connecting Devices to the TX-I/O Island Bus.
Completing the Installation
CAUTION:
For RS-485 ALN or FLN, terminate only one
end of the shield wire on the enclosure earth
ground.
For a 3-wire system,
terminal is connected
to reference wire. Protective ground terminal
may be connected to earth ground.
For a 2-wire system,
terminal is not
connected. Protective ground terminal must
be connected to earth ground.
NOTE:
Do not connect the power or network
communication cable until instructed to do so
during start-up.
1.
Terminate power wiring to the 24 Vac removable
plug.
2.
If necessary, terminate wires to the
communications terminals (CS and CD).
The installation is now complete.