Installing the generator and the stand
Aligning the stand
4
1.
Align the stand vertically by means of the levelling screws (1/Fig. 8) .
For adjustment of the levelling screws, use a ratchet spanner 1/2" with extension
(without socket).
2.
Cover the levelling screws with the cover discs supplied.
Fig. 6
Control console on free-standing radiation shield
(option)
Fig. 7
Control console mounted on table
It is important that all six screws bear against the floor to ensure
optimum stability of the stand.
Fig. 8
Levelling screws
If bolting to the floor is required, please refer to Chapter 19 "Bolt-
ing the stand/generator to the floor" on page 19 - 1.
<