Examples of Configurations X Capacities x Times
As an example, a simulation was carried out in some of the settings of the HiPath 1150/1190
systems for the working period of the system when there is in an outage in the AC network
under normal call traffic conditions.
HiPath 1150
Table 3-36
Examples of the working period of the batteries in the HiPath 1150
Increasing by one EB 210 module reduces the total time by 15 minutes.
HiPath 1190
Table 3-37
Examples of the working period of the batteries in the HiPath 1190
Increasing by one EB 210 module reduces the total time by 15 minutes. If the working period
is less than 1.5 hours, this falls by 5 minutes.
3.9
Main Distribution Frame
Introduction
The Main Distribution Frame (MDF) connects cabling to a public exchange and extensions
using Connectors.
Follow the procedures described in Chapter 4.9, “Connections to the system’s MDF” on page
4-170 to attach the cables to the MDF Connectors.
All Connectors required for attaching the cables are provided with the modules and systems.
Settings
Battery capacity
Working period
01 MB
7Ah
14 hours
01 MB + 01TME1
7Ah
10 hours
01 MB + 01 EB 210
7Ah
11 hours
Settings
Battery capacity
Working period
01 CPU + 01 EB 210
7Ah
11 hours
01 CPU + 01 EB 210 + 01TME1
7Ah
9 hours
01 CPU + 02 EB 210 + 02TME1
7Ah
4 hours
Summary of Contents for HiPath 1100
Page 1: ...HiPath 1100 HiPath 1120 HiPath 1150 HiPath 1190 Service Manual ...
Page 14: ...Figures 14 Service Manual ...
Page 124: ...Modules 3 124 Service Manual Interconnect cables ...
Page 190: ...Installation 4 190 Service Manual Performing a visual inspection ...
Page 323: ...Service Manual 7 323 Operation Driver Installation Figure 7 44 Windows 2000 Driver location ...
Page 368: ...Operation 7 368 Service Manual HiPath 1100 applications ...
Page 384: ...Abbreviations 9 384 Service Manual ...
Page 388: ...388 Service Manual ...