Mounting / Installation
Preparation
5
33 | 62
Building Technologies
009757_f_en_--
Fire Safety
2016-08-23
Manual call point FDM225
1. Open the manual call point as shown in the diagram.
– Insert the key into the opening on the bottom of the manual call point.
– Use the key to pull the housing cover forward and off the switching unit.
2. If you are using a back box FDMH295-R for surface-mounted cable entry
(installation step 3 in the diagram), then it is necessary to perform the following
additional steps:
– Mark the drill hole(s) with a diameter of max. 20 mm on the back box. You
will find a drilling jig (1) in the 'Dimensions [ 56]' chapter.
– Clamp the back box in a bench vice.
– NOTICE! Improper use of tools! Risk of injury! Observe the tool
manufacturer's safety notices.
– Drill the entry opening(s).
The manual call point FDM225 is now prepared for mounting.
Figure 11: Opening the manual call point FDM225 with the key
1
3
2
max. 20 mm
1