Siemens FCA2018-U1 Installation Instructions Manual Download Page 6

Siemens Industry, Inc.
Building Technologies  Division

A6V10315044_enUS_c

6

INSTALLATION

The FCA2018-U1 mounts with two flanges on the side of the terminal block covers.
Select a smooth surface within 6 feet of the PAL-1 for the FCA2018-U1.

Position the FCA2018-U1 and attach it to the mounting surface using the four #6 self
tapping screws provided.

Install the terminal block covers using the 6 remaining #10 nuts. Refer to Figure 3.

ELECTRICAL RATINGS

24V Back Plane Current

0

Screw Terminal 24V Current

150mA Max.

6.2V Back Plane Current

0

24V Standby Current

150mA Max.

Output Power

CAN Network Pair

8V peak to peak max.

75mA max.

(during msg transmission)

Summary of Contents for FCA2018-U1

Page 1: ...terface When used in conjunction with the PAL 1 it provides a supervised logging printer meeting the requirements of NFPA 72 Proprietary or UL 1076 Security systems For NFPA 72 Local Auxiliary or Remote Station applications any UL EDP listed Centronics parallel printer may be used See notes 2 3 and 4 on Figure 3 Features FCA2018 U1 features are as follows Supervision of the PAL 1 includes paper ou...

Page 2: ... U1 contains one reset switch three LEDs one termination switch and one UFP address switch as shown in Figure 2 A reset switch is located on the top of the panel Pushing the reset switch re initializes the FCA2018 U1 operation POWER Green Normally ON When illuminated indi cates that power for the FCA2018 U1 is applied to the module CPU FAIL Yellow Normally OFF When illuminated indi cates that the ...

Page 3: ...ich has a inch conduit opening and a cover Attach the lower bracket to each end of the FCA2018 U1 using four of the 10 nuts provided in the FCA2018 U1 hardware kit Reserve the covers and the remaining hardware until the FCA2018 U1 is mounted and wired Mount the FCA2018 U1 to either the wall or desk where the PAL 1 is located Use the four mounting holes in the lower bracket NOTES 1 The maximum dist...

Page 4: ...und fault detection impedance _ CHASSIS GROUND 24V INPUT 1 2 3 TO FC360 X1_N SUPERVISED POWER LIMITED TO FC360 X1_P The FCA2018 U1 can be connected to the UFP Style 6 or Style 4 Refer to the FS20 configuration for the proper Style If the FCA2018 U1 is connected at the end care must be taken to properly terminate the UFP See Figure 6 for the wiring instructions when the FCA2018 U1 is connected as S...

Page 5: ...X2 1 RS485 AF RS485 BF RS485 AR RS485 BR DO NOT USE SUPERVISED POWER LIMITED TO NEXT UFP MODULE Figure 8 UPS Wiring Diagram 1 H 2 GND 3 N 4 H 5 N 9 H 10 GND 11 N 6 H 7 GND 8 N 120 VAC UTILITY POWER SOURCE DO NOT USE DO NOT USE POWER TO PRINTER 120 VAC SEE NOTE 4 AC INPUT FAIL TERMINAL BLOCK LOCATED ON UPS SYSTEM CONTROL BOARD TO HTRI S D R INPUT TERMINALS PROGRAM AS NORMALLY CLOSED TROUBLE CAUSING...

Page 6: ...he FCA2018 U1 Position the FCA2018 U1 and attach it to the mounting surface using the four 6 self tapping screws provided Install the terminal block covers using the 6 remaining 10 nuts Refer to Figure 3 ELECTRICAL RATINGS 24V Back Plane Current 0 Screw Terminal 24V Current 150mA Max 6 2V Back Plane Current 0 24V Standby Current 150mA Max Output Power CAN Network Pair 8V peak to peak max 75mA max ...

Page 7: ...Siemens Industry Inc Building Technologies Division A6V10315044_enUS_c 7 This page was left intentionally blank ...

Page 8: ...Siemens Industry Inc Building Technologies Division Florham Park NJ Document ID A6V10315044_enUS_c This page was left intentionally blank P N A5Q00050826 ...

Reviews: