A70 Level 2 Service Manual
Copyright © Siemens Pte Ltd.
All Rights Reserved
Mai 2005
COM D CCQ SLI APAC
Page 13 of 36
Internal Use Only
6 Disassembly of A70
Note:
ESD concept; the internal circuits will be more susceptible to ESD because of
the use of exchangeable housing. The construction of the internal block must be/is
designed, in the best possible way, to protect the circuit against sparks.
The keypad must be completely closed to prevent any occurrence of an ESD
disruptive discharge.
The SIM contacts may be open, thus reachable for ESD contact discharge. This
could lead to damage or destruction of the E-Goldlite pins.
It is a requirement for the service personnel to observe ESD protection rules while
performing servicing the A70.
Step 1
Front view of the A70
Step 2
Back View of the A70
Step 3
Remove Battery cover.