
6
Before You Begin
Before installing the meter, familiarize yourself with the steps in this guide and
read the safety precautions presented on the “Installation Considerations”
page.
D
ANGER
Do not power up the meter until the current and voltage wiring is completed.
Recommended Tools
Phillips screwdriver
Precision flat-head screwdriver
Wire cutters / stripper
Meter Overview
Front Panel Button Functions
PROG
/
SELECT
:
Press the
PROG
/
SELECT
(program or select) button to enter Setup
mode. In Setup mode, press the
PROG
/
SELECT
button to accept changes.
ESC
:
Press the
ESC
(Escape) button to return to a higher menu or discontinue a
configuration change.
NAVIGATION
:
Press the
UP
/
DOWN
arrow buttons to highlight menu items, or
increment / decrement numbers.
Press the
LEFT
or
RIGHT
arrow buttons to move to an adjacent digit.
SOFTKEY
:
Press a
SOFTKEY
button to select the parameter that you want to
configure from the sub-menus.
G
N
_
L
+
AI4
AO4
AI3
A03
AI2
A02
AI1
AO1
DI1
DI2
DI3
DI4
DI5
DI6
DI7
DI8
DICOM
TXD
TXD
RXD
DCD
C
C
OM ARD
Navigation
Buttons
PROG
/
SELECT
Button
Softkeys
ESC
Button
Communications
Card
Form C
Digital Outputs
Digital
Inputs
Form A
Digital Outputs
Digital Inputs
Analog Inputs
Analog Outputs
Voltage and Current Inputs
Power
Supply
Ground
Terminal
Meter Front
Meter Back
Optical Port
I/O Expansion
Card
Operational
LEDs
PROG
ESC
Summary of Contents for 9510
Page 1: ...9510 9610 Power Meter Installation Guide ...
Page 2: ......
Page 26: ...26 ...
Page 27: ......