Installation
6 Installation
6.1 Procedure
Follow these steps to install the unit and check off items you finished:
Determine installation location for controller.
Pay close attention to the cable entry points.
Unpack the AC5160.
Remove enclosure shell from the base plate. The enclosure shell is
attached to the base plate with a screw.
Mark drill holes for the base plate.
Drill 6 plug holes (Ø 8 mm) for the base plate and insert plugs.
Screw in both upper screws until only approx. 10 mm are visible.
Attach base plate to both upper screws.
Screw in the two lower and center screws to fasten the base plate and
then tighten all 6 screws.
Insert cable.
Strip the insulation from the peripheral cable and attach the cable ties to
the indicated positions to ease the strain on the cables.
Place sheath wires of shielding on grounding screws.
Place peripheral cables directly on components.
Strip power cable (230 V) and connect to power supply (see section 7.5
“Power Supply”).
Connect ground.
Check wiring.
Connect cover contact to ACC.
Insert battery and connect to the power supply.
Turn on system.
Connect PC to TCP/IP interface of ACC.
Configure ACC.
Connect FLN components of FLN bus to a PC by using a RS232/485
converter.
Configure FNL components with the ‘FLN Configurator’ program.
Start up the system.
Check all system functions. If necessary, analyse and eliminate errors
(troubleshooting).
Place installation instructions, inventory list, configuration and structure
plans into the controller.
Carry out acceptance procedure.
Close cabinet and attach seal.
10
Siemens Building Technologies
A24205-A335-B219.doc
Fire & Security Products
08.2004