Mechanical systems
The installation of the new arm cable harness is performed in the reverse order.
•
Connect all wires on the single tank according to (Fig. 21).
•
Install the collimator and its wires. Attach only cover "C".
•
Connect all connections and reinstall all cable clamps. Install new cable ties.
Fig. 21
MOB00479
BK = Black
BU = Blue
RD = Red
YE = Yellow
GN/YE = Green/ yellow
WH = White
VT = Violet
OG = Orange
BN = Brown
Voltage divider
HT-
BK
WH
BK
OG
YE RD
GN
BK
BK
BK
Temperature sensor
HT transformer
Resistor for
mA measuring
(mA pos)
Stator
for the
rotation
BK
BU
RD
BN
BK
GN/YE
BK
BN
VT
BU
Filament transformer
Voltage
divider HT+
WH
K71
OG