
AEROPAC
Original operating instructions
34
07.2019
DEUTSC
H
EN
GLISH
FRAN
Ç
AIS
IT
ALIAN
O
NEDERL
ANDS
POL
SKI
РУССКИЙ
6. Installation
6.1 Installation requirements
• Suitable installation location:
- In the vicinity of a 230 V AC power connection (unit's maximum cable length: 4.5 m)
- When a permanent mains connection is used over a flush-mounted box
- Not in the immediate vicinity of radiator thermostats
• A smooth and even wall
• Ensure that no cables or pipes are routed inside the wall at the unit's designated position.
• Keep the unit free from dirt during installation and before start-up.
• To prevent damage to the high-quality surface of the unit, it is advisable to wear suitable gloves
during the installation.
6.2 Additional requirements for AEROPAC smart
• The AEROPAC smart should be installed to be as free from interference as possible.
The following interferences can have a negative influence on the WLAN signal:
- Water lines
- Stone and concrete walls
- Metal objects
- Air conditioning units
- Wireless devices (e. g. radio telephones, baby monitors, Bluetooth loudspeakers, etc.)
- WLAN networks on the same wireless channels (e. g. the neighbour's WLAN router)
• If energy-carrying cables are routed in parallel to data cables (ISDN, DSL, etc.), this could lead
to interference e.g. in the speed of the data transmission.
Summary of Contents for AEROPAC
Page 27: ......