background image

Code

Description

Course of action

E.14.

Hilscher COM module: No "ready" signal after cold

boot

Check fieldbus connection.

Check the PLC software.

E.15.

Hilscher COM module: Data exchange not activated Check fieldbus connection.

Check the PLC software.

E.16.

Hilscher COM module: No communication with net-

work

Check fieldbus connection.

Check the PLC software.

E.17.

Hilscher COM module: Watchdog timeout

Check fieldbus connection.

Check the PLC software.

E.18.

Hilscher COM module: Communication error to net-

work

Check fieldbus connection.

Check the PLC software.

E.19.

Hilscher COM module: Module runs, but communi-

cation with internal dual-port memory cannot be es-

tablished.

Check fieldbus connection.

Check the PLC software.

25

Gateway 0362151 - PROFIBUS to SERVOLINK 4 Connection

Connectors, Switches and Displays

Summary of Contents for 0362151

Page 1: ...Gateway 0362151 D 00000009 2 2021 03 26 Gateway 0362151 PROFIBUS to SERVOLINK 4 Connection SIEB MEYER...

Page 2: ...aarkamp 21 21339 Lueneburg Germany Phone 49 4131 203 0 Fax 49 4131 203 2000 support sieb meyer de http www sieb meyer de SIEB MEYER Shenzhen Trading Co Ltd Room A208 2 F Internet Innovation and Creati...

Page 3: ...e Designation 16 4 5 Device Versions and GSD File Versions 16 4 6 Technical Data 16 4 7 Connecting the Gateway 17 5 Mounting and Demounting 18 6 Connectors Switches and Displays 19 6 1 Address Selecti...

Page 4: ...s in this manual to avoid danger WARNING Risk of injury Indicates an imminently hazardous situation which if not avoided will re sult in death or serious injury Follow the instructions in this manual...

Page 5: ...1 3 Abbreviations n c not connected STO safety function Safe Torque Off VCC voltage at the common collector 5 Gateway 0362151 PROFIBUS to SERVOLINK 4 Connection About this Manual...

Page 6: ...achine or installation confirms the CE conformity of the complete machine or installation Note If the mechanics or the electronics of the device are modified the conformity with the EC EEC directives...

Page 7: ...ration SIEB MEYER products are not suitable for use in areas exposed to explosion hazards ATEX zones without approriate housing Terms according to DIN EN 61800 Before initial operation make sure that...

Page 8: ...61800 3 for PDS Note Refer to the product documentation of your device to find out whether or not your device is equipped with a line filter For detailed information on line filters refer to the manu...

Page 9: ...ltage and must be reformed For this the operating voltage is applied via a 1 k series resistor for one hour Please contact the SIEB MEYER service department for details 2 6 Installation NOTICE Damage...

Page 10: ...rts after a device has been switched off Consider the VDE regulations and the applicable accident prevention regulations e g VBG 1 and VBG 4 DANGER Risk of serious injuries due to improper connection...

Page 11: ...garding the operation with residual current device RCD re fer to the manual EMC Guidelines chapter Safety relevant Aspects Residual Current Device RCD 2 8 Operation WARNING Risk of serious personal in...

Page 12: ...rranty shall be declared in an additional contractual agreement between SIEB MEYER and the customer Claims for damages are excluded due to improper use of the device when the device has been installed...

Page 13: ...grounding and wiring safety relevant aspects extracts from the EMC product standard possibilities for the connection to different supply system types Availability PDF file under www sieb meyer de down...

Page 14: ...rge of the connection to the PROFIBUS and every thing necessary for the communication with the fieldbus master The data of the cyclic channel are made available for the second processor The latter acc...

Page 15: ...range Current Indicates the current consumption of the device Serial number Indicates the individual number of the device Device version Indicates the version of the hardware if no version is existent...

Page 16: ...For information on the device versions and the corresponding GSD file version refer to the Technical Information TIE_GSD file_SM_SLGW_VersionInformation pdf 4 6 Technical Data Device variant 0362151...

Page 17: ...e data width of PROFIBUS and SERVOLINK 4 as well as the telegram format you can connect the following drive combinations to one gateway at most Telegram format 16 byte out 16 byte in standard telegram...

Page 18: ...e device to the upright position until the latch at the bottom device suspension is locked Demounting Place a screw driver in the groove at the bottom device suspension as shown in the right figure be...

Page 19: ...hows status and error messages of the gateway 6 1 Address Selection Switch for PROFIBUS slave The gateway provides two switches on the front panel for addressing purposes These can be used to select t...

Page 20: ...BUS 4 O RTS Request to send 5 I O GND Reference ground for bus termination 6 VCC5 5 V supply voltage for bus termina tion 7 n c 8 I O RxD TxD N A Receive transmit data slave 9 n c Stud bolt flange max...

Page 21: ...mended bending radius is six to ten times greater than the minimum bending radius Min 25 mm Procedure 1 Remove at least 7 mm of the optical fiber cable s plastic sheat diameter 2 2 mm see figure 1 Tak...

Page 22: ...4 X5 JTAG Connector Service interface for SIEB MEYER 6 pole Mini Combicon connector 6 2 5 X6 USB Connector Service interface for SIEB MEYER 4 pole female USB connector type B 6 3 Status Displays The...

Page 23: ...uring nor mal operation Send the gate way to SIEB MEYER SYS Off No communication 24V supply switched off or fieldbus module defective Switch on the 24 V supply Yellow On Normal operation fieldbus modu...

Page 24: ...ssages Code Description Course of action E 03 Fieldbus module has the internal status error In addition the LED SYS lights red Check fieldbus connection Restart the gateway E 04 SERVOLINK checksum err...

Page 25: ...rk Check fieldbus connection Check the PLC software E 17 Hilscher COM module Watchdog timeout Check fieldbus connection Check the PLC software E 18 Hilscher COM module Communication error to net work...

Page 26: ...STA2 23 M Mounting 18 O Optical fiber cables connection 20 preparation of optical fiber cables with connector 21 P PROFIBUS connection 17 20 R Residual current device RCD 11 S SERVOLINK 4 connection...

Reviews: