COMMISSIONING
6
6
Commissioning
6.1
Commissioning of the humidifier containers (option)
▸
Remove possibly present transport safety devices. Insert bubbling frits in the humidifier
containers.
▸
Fill the humidifier containers with solution and/or distilled water. Recommended filling
level approx. 50%. The bubbling frit must be completely immersed.
6.2
Before switching on
Check the following prerequisites:
▸
Observe the ambient temperature for operating the PowerCEMS100 analyzer or system
components (see
Chapter 12.3 Technical data, page 64
).
▸
Dry and clean interior of the PowerCEMS100 analysis system.
▸
All filters, filter elements and inserts fitted and ready for operation.
▸
Hose connections checked for tight seat.
▸
All project-specific external components and signal generators to be integrated such as:
– Sample gas probes
– Sample gas lines
– Temperature sensors
– Pressure sensor
or other external signal generators and transmitters connected and ready for operation.
▸
Catalyzer cartridge inserted in NO
x
converter.
Note
▸
The PowerCEMS100 analysis system may only be put into operation by
skilled persons who, based on their device-specific training and knowledge of
the device as well as knowledge of the relevant regulations, can assess the
tasks given and recognize and avoid hazards.
NOTE
CAUTION!
Set up the PowerCEMS100 analysis system in vertical operating position
24 hours
before
first commissioning.
This ensures the cooling liquid in the sample gas cooler sinks.
Note
▸
Before commissioning, the system must have been installed for at least
24
hours
in its intended operating position at the installation location to achieve
optimum operating conditions and prevent damage to system components.