INSTALLATION
4
4.7
Connecting the main power supply
▸
Lead the power cable through the cable ducts (clamping range: 10 ... 14 mm).
▸
Connect flexible wires to the circuit breaker and PE terminal.
Line cross-section: 0.5 ...4 mm
2
.
Note:
A protective conductor must always be connected to the PE.
Fig. 9: Connections on the circuit breaker
DANGER
Dangerous voltage.
Serious injuries or death.
▸
Only qualified personnel may perform electrical work on the MPR.
▸
Disconnect the power supply.
▸
Check residual voltages on the components.
Legend
1
PE
2
L1
3
N