Commissioning and parameterization
FLOWSIC200 · Operating Instructions · 8013271/1CJ9/V2-0/2022-01 · © SICK Engineering GmbH
71
4.2.4
Entering system data
Basic requirement for every measurement is selecting the unit system (metric or imperial
units) to be used and entering the installation parameters (measuring distance, installation
angle). Carry out the following steps for setting:
Open device file “FLOWSIC200 M”, “FLOWSIC200 H” or “FLOWSIC200 H-M“.
Set the sender/receiver unit in “Maintenance” and enter the Level 1 password (
Select directory “Configuration / Application Parameters“ (
).
In field “Installation Parameters“ (
), enter the path length and installation
angle (
). The settings are uploaded to the FLOWSIC200 after switching
from “Maintenance” to “Measurement”.
The following is applicable for application parameters:
Fig. 58
Basic parameters
The installation parameter settings are converted automatically when the unit
system is changed.
Test
L
Flow direction
Entry field
Parameter
Installation
angle
α
Angle between
measurement axis and
flow direction
Measuring
distance
L
Distance transducer -
transducer