Siamp SCU 350 Assembly Instructions Manual Download Page 3

3

Tools required:

• Set of keys from 8 to 19mm

• Metal saw

• Drill with a bit diameter 8mm

• Leveller

• Pencil & ruler

• Measuring tape 

• Hammer
• Screwdriver

Advice:

•  Keep this notice for any future maintenance

  Read the instructions supplied with 

the bowl, the cover, the tank and the 

pressurised water supply system before 

starting installation work.

Elbow bend fixation clip
Elbow bend fixation
Pipe fixation clip
Pipe fixation 
Fixation screw and washer ( x4)
Bowl fixing strip (x2), length 400mm
Flexible sleeve (x 2)
Bowl fixing kit
Metal pegs (x6)
Adjustable legs (x2)

Punch screw

Wall brackets (x2)
Washer (x4)
Wall screw (x4)
Wall plugs (x4)
Collar bidet (x1)

a

l

b

m

c

n

d

o

e

p

f

g

h

i

Evacuation kit elbow bend 

Ref. 92 4000-07

Evacuation kit straight 

Ref. 92 4010-07

ACCESSORIES (not supplied)

Evacuation kit

Elbow bend pipe

Straight pipe

Evacuation  

pipe

Evacuation  

pipe

j

k

Summary of Contents for SCU 350

Page 1: ...BATICUVETTE BIDET SCU 350 ASSEMBLY INSTRUCTIONS...

Page 2: ...2 DESCRIPTION o n l m c d e h i f g b k p j a...

Page 3: ...on work Elbow bend fixation clip Elbow bend fixation Pipe fixation clip Pipe fixation Fixation screw and washer x4 Bowl fixing strip x2 length 400mm Flexible sleeve x 2 Bowl fixing kit Metal pegs x6 A...

Page 4: ...era mics at the bowl fixation level This calculation does not take into account any constraints due to the tank or pressurised water supply III Height adjustable from 325 to 525mm IV Height of the bow...

Page 5: ...axis and fix them in place with 2 nuts Place the frame in its final position Unscrew the 4 nuts k Adjust the leg heights so that the top of the bowl is at about 400 mm from the finished floor Check t...

Page 6: ...l to a depth of 70 mm Move the frame back in place position the metal pegs i in the holes without any effort Measure the diameter of the feeder pipe at the place where it will be attached to the fixat...

Page 7: ...he diameter of the evacuation pipe at the place where it will be attached to the fixation clip Attach the fixation clip using 2 screws and washers e and adjust the height according to the measured dia...

Page 8: ...bend supply pipe into place Attach the elbo bend pipe using the fixation clip a If you need to unclip wing nuts are attached to the fixing clips to do this c a d b Wing nuts Wing nuts VI PUTTING THE F...

Page 9: ...upply pipe and the evacuation pipe into the holes on the bowl Place the bowl in the frame Turn the water on and flush Check that the arrival and evacuation pipes are sealed watertight Take the bowl of...

Page 10: ...he part which sticks out from the wall is equal to B 20mm Shorten the flexible sleeves so that the part which sticks out from the wall is equal to B 15mm Using a ruler placed as in the drawing below m...

Page 11: ...To make insertion of the supply and evacuation pipes easier use soapy water B XI ATTACHING THE BOWL When the bowl has been correctly positioned attach it using the kit h taking care to put the parts o...

Page 12: ...DETCONNECTION VI WATERTRIAL V PUTTINGTHEFRAMEINTOPLACE VII FINALINSTALLATION Mount bidet collar onto frame Install bidet water supply and drain Install bidet directly onto frame but without cladding M...

Reviews: