NETWORKS
5
RM24/58
Ground RM24/58
STEP 1
Crimp the grounding lug at both the ends on the earthing cable.
STEP 2
Connect and tighten one end of the earthing cable to RM24/58.
STEP 3
Connect other end of the earthing cable to the earth pit on the ground.
i
Note
: Ensure that ground earthing is separated from power earthing.
Connect RM24/58 to PoE Injector
STEP 1
Route the cable from RM24/58 into the building where PoE injector is placed.
STEP 2
Secure the cable along its path.
STEP 3
Connect the cable from RM24/58 to the appropriate RJ-45 connector on the PoE injector.
Supply Power to PoE Injector
STEP 1
Connect the PoE adapter to the main electrical supply and the power cord
plugged into the socket of the adapter.
STEP 2
Turn on the power supply.
RM24/58 starts receiving power through the PoE adapter.
Align Master and Slave RM24/58
STEP 1
Turn on the power supply of the PoE injector at both the sites.
STEP 2
Align master RM24/58 in the direction of slave RM24/58.
STEP 3
Turn slave RM24/58 towards master site, listening to the beep sequence until
optimal alignment is achieved.
i
Note
: Frequent beeps indicate better signal strength. Higher signal strength has lower
pause time in between the beeps.
Frequency of beep confirms the link quality. The signal strength improves with
the increase in the beep frequency. After approximately 40 seconds, the slave
RM24/58 beeper starts beeping which indicates a normal operation.
STEP 4
Tightly secure slave RM24/58 onto the mast/wall.
STEP 5
Repeat the same procedure at the master site.
Congratulations! The installation of RM24/58 is complete.
Beeper Sequence = On
= Off
Description
Indicates a good signal
Indicates a weak signal
No air link