shumatt Carter 320D Instruction Manual Download Page 6

                                Shenzhen Shumatt Technology Co., Ltd. 

 

 

  4   

1.4 Specifications 

Specification 

No. 

Name 

parameter  No. 

Name 

parameter 

Length 

21 cm 

Volume 

2793 cm

³

 

Width 

19 cm 

Weight 

750 g 

Height 

7 cm 

 

 

 

Packing parameters 

No. 

Name 

parameter  No. 

Name 

parameter 

Length 

22.5 cm 

Volume 

3920.625 

cm

³

 

Width 

20.5 cm 

Weight 

1250 g 

Height 

8.5 cm 

 

 

 

2 .SAFETY INFORMATION 

(1) Non-professionals are not allowed to disassemble and 
repair the equipment. 
(2) This tool should avoid contact with children, to avoid 
danger, if a child swallows small parts, please rushed to the 
hospital immediately for treatment. 
(3) Avoid products under high temperature operation; 
avoid squeezing, to avoid danger. 
(4) Do not throw, down or stepping on the device, to avoid 
the risk of the holder by a strong external impact occurs. 
(5) Do not insert foreign objects into the connector portion 
of the holder. 
(6) In connection, pay attention to thread alignment, there 
is no alignment cannot be forced to install. 

3. SALE STATEMENT 

(1) Products and components warranty period of three 
months, the warranty period for the first time from the 
product purchase date (to purchase formal credentials 
date) starting time of purchase date to purchase the 
product warranty registration card, whichever date; 

(2) Provides free product debugging and testing. To obtain 
warranty service, you can contact directly with the seller or 
an authorized service agency can also call our telephone 
service, contact us by our service personnel placement 
services. 

4. DISCLAIMER 

If Products exist the following conditions, warranties and 
service under this document will not apply: 

(1) The product or component has exceeded the warranty 
period; 
(2) Failure or damage caused by the operation, not in 
accordance with the instructions for use; 
(3) The use of the device or replace the original equipment 
malfunction or damage caused when removable parts; 
(4) Because of unexpected factors or human factors 
(including operational errors, scratches, handling, bump, 
improper voltage caused by fault or damage. 
(5) Failure or damage due to force majeure or accidents 
caused; 
(6) The other is not our equipment (including components) 
quality problems caused by failure or damage; 

Note

: Information subject to change without prior 

separate notice, please refer to the company 
website announcement. As you encounter this 
situation, you should find a solution to the 
responsible party, Shenzhen shumatt Technology 
Co., Ltd. does not assume any responsibility. 

5. PRODUCT MAINTENANCE 

(1) When cleaning, use a damp cloth, cleaning treatment 
with neutral detergent, and then wipe dry water stains. 
(2) Severe surface stains, scratches, burns fireworks, you 
can use fine sandpaper (400-500) light grinding surface, 
and then use scouring cloth wipe dry. 
(3) Avoid contact with acid, brine and other corrosive 
substances. 
(4)To keep clean, the use of careless caused surface water 
stains, use a cloth to dry, keep the surface dry. 

6. CERTIFICATE 

Certificate 

Product name

            Carter 320D Common Rail 

Injector stroke measurement 
tool 

Model number

         

              CRT070                           

Manufacture Date

:                              

 

Inspectors

:                                  

Summary of Contents for Carter 320D

Page 1: ...Shenzhen Shumatt Technology Co Ltd 0 Carter 320D Common Rail Injector stroke measurement tool Instruction manual Shenzhen shumatt Technology Co Ltd ...

Page 2: ...Shenzhen Shumatt Technology Co Ltd RODUCT NAME Carter 320D Common Rail Injector stroke measurement tool Model CRT070 Write Charlene Version V2 0 Date ...

Page 3: ...l ruby shumatt com Cell phone 86 13410541523 Technical support support shumatt com INTRODUCTION Carter 320D Common Rail Injector stroke measurement tool is used for the maintenance of the production of 320D Caterpillar common rail injector innovative product design and easy to use can quickly break down the injector replace the valve assembly adjusting the fuel solenoid valve stroke Common Rail In...

Page 4: ...arter injector 2 Use a hex screwdriver and wrench to remove the injector armature disk 3 The dial gauge mounted on the measuring device and zero out then the dial gauge base will be seated into the solenoid valve thread after the reference plane and the remaining gap pads bonding observe indicator and read it then test the desired item ...

Page 5: ...position tool is installed on the injector 2 The fixing nut screwed onto Carter injector 3 Use a wrench to twist the dowel for disassembly injector valve assembly 1 3 3 The Third scenario 1 Align the oil back hole of fuel injector and the oil return hole of the oil collector ...

Page 6: ...ervice contact us by our service personnel placement services 4 DISCLAIMER If Products exist the following conditions warranties and service under this document will not apply 1 The product or component has exceeded the warranty period 2 Failure or damage caused by the operation not in accordance with the instructions for use 3 The use of the device or replace the original equipment malfunction or...

Page 7: ...Shenzhen Shumatt Technology Co Ltd 5 7 WARRANTY CARD Maintenance Record Form filled in by service personnel for maintenance Repair time Failure phenomenon Failure cause Replacement element Signature ...

Reviews: