
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
0004555
Page 3 of 5
8/17/2015
Step #2A – Attach Brackets to Platform
Slide the U-bolts through the brackets and around the cradle tube as shown. The brackets go toward the inside of the boat
lift, and there are right and left brackets so be sure to use the correct brackets. The support tubes should be straight
vertical. Use a 3/4 Wrench to start the U-bolts, but do not tighten.
Step #2B – Attach Brackets to Platform
Slide the 3/8-16 x 7 hex head bolts through the brackets and around the cradle tube as shown. The bracket with the
support tube goes toward the inside of the boat lift. Use a 9/16 wrench to start the bolts, but do not tighten.
Step #3A – Insert Support Tubes
Insert a 1/2-13 x 3 1/2 hex head bolt through the bracket and support tube as shown and tighten the washers and locknuts.
Correct
Incorrect