
25
Mounting the Antenna Bay(s)
e. (
Figure 38
) Tighten the mounting hardware (
Figure
,
3
,
23
,
24
) on the
threaded rods (
2
). Torque in accordance with
Table 1
on page 1.
Figure 38. Tighten
mounting hardware.
f. Retouch the tower paint as necessary.
g. (2-bay or 4-bay) Repeat this chapter for the remaining bays.
Summary of Contents for Versa2une SLV
Page 4: ......
Page 8: ......
Page 11: ...3 Preparation Figure 2 Tower layout two bay antenna ...
Page 12: ...Preparation 4 Figure 3 Tower layout four bay antenna ...
Page 14: ......
Page 34: ......
Page 42: ......
Page 44: ......
Page 46: ......
Page 50: ......