1. Take one half of the roof and slide onto the 
building. Note: roof will not sit down fully. On 
the roof panel there is a gap at one end of the 
bearer, this end goes on the back panel. 
2. Once in position mark on the bearer either 
side of the front panel to enable a small piece 
of the bearer to be cut out in order for the roof 
to sit down properly. 
 
 
 
 
 
 
 
 
 
 
 
 
3. The cut out should be between 12 - 14 mm 
wide. Place roof back on building. Repeat for 
other roof panel. 
4. Secure roof together at the ridge from the 
inside using 3 x 60 mm screws. Drill then 
screw through roof into panel framework  
using a total of 14 x 60 mm screws. 

 

1. Lay verandah floor against the front of the 
building, flush at both ends. 
2. Attach the floor to the building using a 
straightened out ‘L’ shaped bracket and 2 x 
25 mm screws. Repeat. 

 

3. Take one of the verandah railings and 
place it on the verandah floor flush with the 
outside of the building. Mark and cut the  
upright inline with the bottom of the roof 
boarding. 
4. Replace the railing against the building 
flush with all edges and secure using two ‘L’ 
shaped brackets (underneath top bar and top 
of bottom bar) with 4 x 25 mm screws. 
Repeat for other side. 

 

5. Drill then screw through roof into upright of 
railing using 1 x 60 mm screw. Repeat for the 
other side. 
6. Drill then screw through bottom bar of  
railing into verandah floor using 2 x 60 mm 
screws per railing. 

 

 

1. Open roll of felt and lay out on an even 
surface. Measure and cut the required 3 
lengths allowing an overhang of approx 50 
mm on all sides.  

 

2. Starting at the lower edge (the eaves) 
place one piece of felt along the length of the 
building. Secure the felt using felt nails 
spaced at approx.100 mm intervals, but do 
not nail along centre of building until the piece 
of felt covering the ridge is in place. Repeat 
for the other side. 
3. Place the last piece of felt at the ridge of 
the building. This piece will overlap both of 
the other pieces already laid. Nail into  
position along both edges and at both ends. 

 

4. Carefully trim the corners and secure using 
2 x felt nails at each side. 
 
 

 

1. Place the cover strips at the corners of the 
building where the panels meet and secure 
using 4 x 40 mm nails per strip. 

 

1. Secure wall panels to the floor on the   
inside of the building through framework into 
floor bearers using 2 x 60 mm screws per 
panel. 

 

         

 

 
1. Drill two holes into the wood block and 
secure to inside of door opening flush with the  
aperture using 2 x 60 mm screws. 

D  Roof Assembly 

E  Verandah Assembly 

F  Felt Roof  

G  Cover Strips 

H  Secure Walls to Floor 

I  Door Catch Assembly 

Reviews: