
Assembly of Bunny
©
Parts List
QTY DESCRIPTION
1: Door handle (C3)
2: Window hinges (C5)
1: Casement stay (C6)
2: Casement stay pins (C7)
1: Door catch (C8)
2: Vents (F1)
4: 12mm screws
20: 60mm screws
4: 25mm black screws
35: 25mm screws
102: 40mm nails
64: Panel pins
60: Felt nails
Completed Bunny
PLEASE LAY OUT PARTS AND CHECK OFF
AGAINST CHECK LIST BELOW:
QTY DESCRIPTION
4: Timber sections (A x2, B, C)
1: Door (C1)
1: Piano hinge (C2)
1: Window frame (C4)
1: Floor (D)
4: Floor Bearers (D1 x4)
1: Front gable (E)
1: Back gable (F)
2: Roof pieces (G x2)
1: 1 x 2.6mtr roll felt (H)
4: Cornerstrips (I)
4: Plain facia boards (K1)
2: Diamonds (K2)
8: Panes glazing material (L)
32: Pieces beading (L1)
BUIL
BUILT AROUND OUR REPUTATION
T AROUND OUR REPUTATION
Hardware Bag Contents
C3
F1
C8
A
B
C
D
C4
E
F
C1
G
H
I
L1
K1
K2
F1
C3
L
D1
C2
A
C5
C6
C7
C7
C6
C5
Thank you and congratulations on the purchase of your Shire Garden Building. We believe that this product
will give you many years of excellent service. This is a natural product manufactured to a high standard
therefore if you have any queries or experience any difficulties then please contact our customer service
hotline on 01945 465295. Normal office hours: 8.30am to 5.00 Monday to Friday. Answerphone all other times.
Preparation of Base
Adult Assembly Only - Do not attempt to modify this Playhouse
We recommend that the base onto which your building will stand should be at least 75mm larger in each
direction than the total floor size of the building.
Actual floor area of the building:
1190 x 1190mm
Total height clearance:
1550mm
The chosen position in your garden for the siting of the building should be excavated to a depth of 75mm to
allow a base of sand, on to which paving slabs can be evenly laid - THEY MUST BE LEVEL AND FIRM.
Treatment/Care of your Garden Building
Treat with a suitable decorative wood finish immediately. We recommend that all timber pieces be treated
again prior to assembly and again within 3 months of assembly. We further recommend that all pieces are
treated again at least annually or as frequently as the instructions on the product used recommends.
We would suggest that all wall panels be treated in an upside-down position to allow the finish/treatment to
ingress into the tongue and groove jointing.
We would also remind you that you would rarely (if ever) be able to re-treat the underside of the floor
following assembly. We strongly recommend that the underside of the floor is treated an absolute minimum of
twice (not including pre-treatment). Use only child safe wood preservative and allow to dry thoroughly before
further use. Do not use creosote.
Tools Required
IMPORTANT!
PLEASE READ PRIOR TO ASSEMBLY OF
THE BUILDING
EVERY PRECAUTION IS TAKEN TO
ENSURE THAT YOUR BUILDING HAS NO
ELEMENT INCORRECTLY PLACED OR
POSSIBLY HAZARDOUS, HOWEVER
PRIOR TO USE PLEASE CHECK ALL
SURFACES FOR THE FOLLOWING:
1 RAISED GRAIN, SPLINTERS: sand
down timber to smooth finish
2 NAIL/SCREW/PIN HEADS PROUD: tap
home to be flush with surface of timber
3 DAMAGED SCREW HEADS
RESULTING IN SHARP SPLINTERS OF
METAL: replace
4 SHARP ENDS OF NAILS/ SCREWS/
PINS PROTRUDING THROUGH THE
PANEL: remove and reposition.
5 ENSURE ALL PARTS ARE SECURED
AGAINST REASONABLE FORCE:
remove and refit
6 ENSURE THERE ARE NO LOOSE
PARTS: remove and refit/discard
We recommend that protective gloves
be worn throughout
Wood is a natural product and is therefore
prone to changes in appearance, including
some warping, movement and splitting,
particularly during unusual climatic conditions
(long hot or wet spells of weather). As a natural
occurrence this is not covered by a guarantee.
PLEASE NOTE
PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE
●
Posidrive screwdriver (electric is best)
●
Drill and 6mm drill bit
●
Hammer
●
Sandpaper (to smooth any rough edges)
●
Cutting knife
●
Tape measure
●
Step ladder
●
Ruler
●
Pencil
●
Saw
●
Chisel
BunnyAssy(UK) 3/5/04 5:45 PM Page 1