background image

Version 01   

 

       05/

05/2020

 

These instructions are for your safety. Please read through them thoroughly before use. 

PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE 

Mass: 56.0 kg 

Summary of Contents for 6x3 Apex Bike Store No Floor

Page 1: ...Version 01 05 05 2020 These instructions are for your safety Please read through them thoroughly before use PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE Mass 56 0 kg ...

Page 2: ...гом языке пожалуйста отправьте по электронной почте или написать по указанному ниже адресу TR Başka bir dilde talimatları veya bir kopyasını bir kopyası için bir e posta gönderebilir veya aşağıdaki adrese yazınız EN For a copy of the instructions or a copy in another language please send an email or write to the address below I Per richiedere una copia del libretto di istruzioni in italiano o in u...

Page 3: ...embly Only use child and animal safe wood preservative Do not use creosote Allow the wood preservative to fully dry before use Regularly check the building for wear and tear Getting Started GB IE EVERY PRECAUTION IS TAKEN TO ENSURE THAT YOUR BUILDING HAS NO ELEMENT INCORRECTLY PLACED OR POSSIBLY HAZARDOUS HOWEVER PRIOR TO USE PLEASE CHECK ALL SURFACES FOR THE FOLLOWING 1 RAISED GRAIN SPLINTERS San...

Page 4: ...d immediately prior to assembly The building must have been re treated and re sealed annually NOTE Wood is a natural product and therefore the following are excluded from the warranty Colour change Warping Splitting Preparation of base We recommend that the base onto which your building will stand should be at least 75mm larger in each direction than the total floor size of the building Actual flo...

Page 5: ... 6 golden rules of maintenance 1 Timber widely recycled 2 Metal fixings widely recycled 3 Glass widely recycled 4 Roofing felt not currently recycled packaging Building 1 Ensure your base is level and firm 2 Ensure the building is not sitting directly on the ground using damp proof membrane or the optional timber base 3 Ensure every piece of timber and surface especially that is hidden upon assemb...

Page 6: ...Stacked Parts List Description part No Qty 06 ...

Page 7: ...Fascia and Nail Bag Parts List Description part No Qty 07 ...

Page 8: ...In more detail GB IE 08 ...

Page 9: ...In more detail GB IE 09 ...

Page 10: ...Scale 1 1 A0266 x 44 8mm Felt Nail A0025 x 54 40mm Round Head Nail A0035 x 26 60mm Posi Drive Screw Nail bag contents Description part No Qty 8mm A0032 x 51 25mm Posi Drive Screw 10 40 A0033 x 12 40mm Posi Drive Screw ...

Page 11: ...ge 4 You will need Hammer Spirit level Ladder 1mm 5mm drill bit Drill Tape measure Ruler Sand paper Gloves Saw Pencil Goggles A helper for some tasks Screwdriver Sharp knife Masking tape When you see the drill icon Only ever drill through the first piece of framework which will be a pilot hole for the screw to attach the second piece of framework The required drill bit size is shown with the icon ...

Page 12: ...t all the parts before assembly see page 5 GB IE The Panel layout is showing you how to position the panels The Front and Back Panels FIT INSIDE THE SIDE PANELS 3 Plain Panel A5807 x01 Panel Layout Drill one 3 Plain Panel A5807 as above 12 5mm NOTE Some holes drilled for later use A5807 A5807 A5807 A5807 A5818 A5818 A5819 ...

Page 13: ...s A0035 using pilot holes drilled previously 02 13 60mm Screws A0035 x02 Step 1 A5807 x01 3 Plain Panel A5807 x01 If using a drill or electric screwdriver carefully but firmly push the opposite end to the screwdriver bit into the screw head and keep the pressure on to prevent the screwdriver spinning in the screw ...

Page 14: ...the third 3 Plain Panel A5807 as below Fix the panel using 2x 60mm Screws A0035 using the pilot holes drilled in Step 1 14 03 5 mm NOTE Some holes drilled for later use 60mm Screws A0035 x02 3 Plain Panel A5807 x01 ...

Page 15: ...GB IE Screw the last 3 Plain Panel A5807 as below using the pilot holes drilled in Step 3 Fix using 2x 60mm Screws A0035 04 15 60mm Screws A0035 x02 3 Plain Panel A5807 x01 ...

Page 16: ...x with 6x 40mm Screws A0033 05 GB IE Drill and screw the two 1120 Frame A5811 in between the timber built in Step 5 Fix with 4x 60mm Screws A0035 to assembly the front frame 06 5mm 890x25 Frame A5819 x02 890 Frame A5818 x04 5mm 1120 Frame A5811 x02 Step 5 60mm Screws A0035 x04 A5811 A5811 Step 5 Step 5 A5818 A5818 A5819 40 40mm Screws A0033 x12 X2 ...

Page 17: ...17 GB IE Drill and screw the Frame built in Step 6 in between the wall panels as below Make sure the 25mm bar is facing inwards Fix with 6x 60mm Screws A0035 07 5mm Step 6 60mm Screws A0035 x06 ...

Page 18: ...one in the middle Drill the 6 LH Gable Panels A5809 with two holes along the bottom One holes needs to be drilled at an angle as drill will not fit between panel Fix with 10x 60mm Screws A0035 08 X2 X2 6 LH Gable Panel A5809 x02 6 RH Gable Panel A5809 x02 60mm Screws A0035 x10 5mm ...

Page 19: ...d the sides Nail 4x 40mm Nails A0025 29mm in from the edge along the front and back edges and 3x 40mm Nails A0025 60mm in from the edge along the sides MAKE SURE THE NAILS GO INTO THE WALL AND GABLE FRAMEWORK 09 19 OSB Roof Panel A5810 x04 40mm Nails A0025 x22 Nail 29mm in from edge Nail 60mm in from edge ...

Page 20: ...verstrip A5821 to the back centrally using 4x 40mm Nails A0025 Nail the two 1188x80x12 Coverstrips A5823 using 3x 40mm Nails A0025 in each to the front of your building 10 GB IE 20 A5821 A5820 A5823 1188x46x12 Coverstrip A5820 x02 1395x46x12 Coverstrip A5821 x01 1188x80x12 Coverstrip A5823 x02 40mm Nails A0025 x16 A5820 A5823 ...

Page 21: ...lt on top of your building as below making sure there is an even overhang all around Nail using 6x 8mm Felt Nails A0266 along each front and back edge Fold the felt under the roof panel along the sides and nail with 10x 8mm Felt Nails A0266 11 21 Tidying the edge 2 5m Felt Strip A3035 x01 ...

Page 22: ... Hinges A0049 as below Making sure they are screwed over the framework on the back of the door Fix with 4x 25mm Screws A0032 in each hinge 12 22 Door A5808 x02 Tee Hinge A0049 x04 25mm Screws A0032 x16 Hinge over door framework Back View 3mm ...

Page 23: ...ach hinge first hang the doors within the framework Tip Use packing underneath the doors to level them out Once happy finish by screwing the rest of the screws into the hinges 23 13 Step 12 A5808 x02 GB IE 3mm 25mm Screws A0032 x12 ...

Page 24: ...eces cut in Step 14 screw the two 555mm pieces to the right hand door or door that you wish to open first so that one that is flush with the bottom and one is flush with the top DO NOT FIX TO BOTH DOORS Screw the 205mm piece in the centre of the front gables using 25mm Screws A0032 15 GB IE 3mm Flush with boƩom of door Flush with top of door and boƩom of gable Step 14 A5821 x01 25mm Screws A0032 x...

Page 25: ...eet before you screw 16 GB IE 3mm 25 GB IE Screw the two 80x46x12 Coverstrips A5822 to the inside of the secondary door Door that opens last using 25mm Screws A0032 One at the top and one at the bottom Cut if necessary Make sure it sits flush with the top of the framework test that the door still opens and closes 17 Hasp and Staple A0123 x01 25mm Screws A0032 x05 Hasp Staple 80x46x12 Coverstrip A5...

Page 26: ...and drill a hole for the bolt to go into Using 4x 25mm Screws A0032 fix the Barrel Bolts A0014 to the 80mm Coverstrips from Step 17 Repeat for the top 18 26 Barrel Bolt A0014 x02 DRILL HOLE WHERE THE BOLT SLOTS INTO THE FRAMEWORK USING 5MM DRILL 3mm 25mm Screws A0032 x08 5mm ...

Page 27: ...ont and back of your building Fix with 3x 40mm Nails A0025 in each Lastly fix the two Diamonds A0019 to the coverstrips centrally using 2x 40mm Nails A0025 in each 19 GB IE 1021 Coverstrip A5824 x04 27 Diamond A0019 x02 40mm Nails A0025 x16 ...

Reviews: