14
Before you start
Before you start
Assembly
Install blower pipes
Place the blower upright on the ground or on a sturdy work sur-
face.
1.
Grasp the blower pipe and push the pipe over the blower dis-
charge port.
2.
Lock the blower pipe to the blower discharge port by rotating
the pipe until a clicking sound is heard.
3.
Grasp the nozzle and then push the nozzle over the blower
pipe.
4.
Lock the nozzle to the blower pipe by rotating the nozzle.
Remove blower pipes
1.
To detach the blower pipe, push the locking pin in and rotate
pipe anticlockwise. The hex wrench can be used.
WARNING
Read the operator's manual carefully to ensure that you assemble the product correctly.
Never perform maintenance or assembly procedures with engine running.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.
1. Blower pipe
2. Blower discharge port
1. Blower pipe
2. Nozzle
IMPORTANT
Do not operate the blower with only the blower pipe installed
and without the nozzle properly installed.
Do not install the the nozzle directly to the blower discharge
port.
IMPORTANT
Blower pipe installation affects both blower balance and perfor-
mance.
1. Blower pipe
Summary of Contents for EB221S
Page 2: ...3 Packing list Packing list ...
Page 31: ...29 X750 024 05 0 X750 190 030 0 2014 1Notes and rear cover MEMORANDUM ...
Page 97: ...33 X750 024 05 0 X750 190 030 0 2014 1Notizen und hintere Umschlagseite NOTIZEN ...
Page 129: ...31 X750 024 05 0 X750 190 030 0 2014 1Note e quarta di copertina MEMORANDUM ...
Page 131: ...4 Packing list ...