Shimadzu ICPMS Quick Start Manual Download Page 4

 

 

Shimadzu Scientific Instruments

, 7102 Riverwood Drive, Columbia, MD 21046 

Tel: 800.477.1227/410.381.1227; Fax: 410.381.1222; www.ssi.shimadzu.com

 

 

ICPMS 

– Startup procedure 

 

1.  Refer to the instruction manual, (PN 305-

34411, “ICPMS-2030 Instruction Manual”) 

for specific startup procedures. 

2.  Start up the duct exhaust system. 

3.  Supply cooling water after checking levels and the absence of contamination in the 

external chiller water. 

4.  Check the oil in the external roughing pump, maintenance if necessary, and power 

on. 

5.  Turn on argon and helium at the source

—ensure proper pressure is not exceeded 

during this process: argon at 450 kPa ±10kPa, helium at 150 kPa ±20 kPa. 

6.  Turn on the power switch on the left side of the main ICPMS-2030 body. 

7.  Turn on the PC and other peripherals. Open software to establish communications. 

Allow vacuum to pump down overnight before turning on plasma. 

8.  Fill the J-tube with water to create a pressure seal to the torch. 

9.  Check the  glassware  and  cones,  as  well  as  peristaltic  pump,  nebulizer  and  other 

sample introduction accessories before turning on the plasma. 

10. Refer to manual for additional details. 

 

 

 

 

 

 

 

 

 

 

Page 4 of 4 

Reviews: