Shimadzu Scientific Instruments
, 7102 Riverwood Drive, Columbia, MD 21046
Tel: 800.477.1227/410.381.1227; Fax: 410.381.1222; www.ssi.shimadzu.com
ICPMS
– Preparing your instrument for shutdown
1. To flush out the system, aspirate with rinse solution for five minutes then DI
water for an additional three minutes.
2. Shut down the plasma by clicking the Plasma Off button in LabSolutions
ICPMS software at the bottom-left of the screen. Wait for the shutdown
sequence to complete.
3. Release tension on the peristaltic pump tubing by releasing the guide arms
and detaching tubing from the tube hangers.
Page 1 of 4