background image

 

 

Shimadzu Scientific Instruments

, 7102 Riverwood Drive, Columbia, MD 21046 

Tel: 800.477.1227/410.381.1227; Fax: 410.381.1222; www.ssi.shimadzu.com

 

 

ICPMS 

– Preparing your instrument for shutdown 

 

1.  To flush out the system, aspirate with rinse solution for five minutes then DI 

water for an additional three minutes.   

2.  Shut  down  the  plasma  by  clicking  the  Plasma  Off  button  in  LabSolutions 

ICPMS  software  at  the  bottom-left  of  the  screen.  Wait  for  the  shutdown 

sequence to complete. 

 

 

3.  Release tension on the peristaltic pump tubing by releasing the guide arms 

and detaching tubing from the tube hangers.     

 

 

 

 

 

 

Page 1 of 4 

 

 

Reviews: