background image

Ensure correct alignment

on all four corners

CB1

CB1

CB1

 2110 

 5215 

 83.07 

 205.31 

Measure the length and width

of the shelter to ensure correct 

alignment

JF1

CB1

S1 Frame

Step 1 

Assemble all 

S1

 Frames to make up the main structure using 

JF1

 bracket

for straight joints and 

CB1

 brackets for the corners.

4

BLUE DIMENSIONS - MM

GREEN DIMENSIONS - INCHES

Summary of Contents for SR1564

Page 1: ...Assembly Instructions Email Sales shelters4less co uk Web www shelters4less co uk Tel 0800 160 1002 SR1564 04 200219 UK Shelter type SR1564 ...

Page 2: ...13 11 12 12 12 11 8 14 7 6 4 5 1 2 3 9 10 2 BALLOON VIEW Wrench Torx bit Tools required Not included Drill Screwdriver Mallet Hack saw ...

Page 3: ...0 7 87x1 58 16 4 P1 Post 2000x1030 78 74x40 55 1 5 ST3 Roof Tie 2060x40x40 81 1x1 58x1 58 1 6 FT1 Foot Bracket 109x100x40 4 29x3 94x1 58 3 7 FT3 Foot Bracket 109x100x80 4 29x3 94x3 15 10 8 RB1 Bracket 110x42x40 4 33x1 81 20 9 R2 Rafter 2200x40x40 86 61x1 58x1 58 6 10 SS Sealing Strip Trim to 2200 Trin To 86 6 5 ROLLS 11 ACE2 Roof Panel 2220x1050 86 6x43 34 2 12 ACC2 Roof Panel 2220x1030 86 6x40 55...

Page 4: ...7 205 31 Measure the length and width of the shelter to ensure correct alignment JF1 CB1 S1 Frame Step 1 Assemble all S1 Frames to make up the main structure using JF1 bracket for straight joints and CB1 brackets for the corners 4 BLUE DIMENSIONS MM GREEN DIMENSIONS INCHES ...

Page 5: ...mbling DETAIL A SCALE 1 5 CB1 BENEATH JF1 INSIDE Step 2 Attach P1 Post using one JF1 bracket then attach ST3 Tie bar using two CB1 brackets and one JF1 bracket Move shelter in to its final position and ensure the structure is square Then attach FT1 and FT3 brackets to secure the shelter to the ground 5 ...

Page 6: ...5 1035 1035 40 75 1035 40 75 1035 40 75 SCALE 1 30 Step 3 Attach R2 Rafters using RB1 brackets Use four RB1 brackets to secure each Rafter and two for the end Rafters Apply SS sealing strips along the length of the rafters ROOF DETAIL 6 ...

Page 7: ...NLY Step 4 Attach ACC2 roof panels and ACE2 roof panels on top of the sealing strips Screw down the RC2 strips along the gaps in the panels Screw down the A2 end caps along the edges of the shelter Then fit the Black plastic caps on exposed nuts and bolts Fit the EC40 square end caps to any open ends of box sections ...

Page 8: ... 5286 OR 208 11 TO FOOT HOLE CENTERS 5215 OR 205 32 2110 OR 83 07 40 75 39 17 41 12 40 75 40 75 40 75 40 75 41 12 40 75 41 12 40 75 40 75 85 49 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 200mm OR 7 87in oversized on all 4 sides 8 ...

Page 9: ...NOTES 9 ...

Page 10: ...NOTES 10 ...

Page 11: ...NOTES 11 ...

Page 12: ...lean panels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched CONTACT DETAILS Email Sales shelter4less co uk Web www shelters4less co uk Tel 0800 160 1002 Unit B Sharp Road Poole BH12 4BG All Parts and Fixings checked by Print Name Signature ...

Reviews: