![ShelterLogic GrowIT 70635 Assembly Instructions Manual Download Page 7](http://html1.mh-extra.com/html/shelterlogic/growit-70635/growit-70635_assembly-instructions-manual_1255524007.webp)
05_70635_0A
Page 7
6. InsTAllInG coVeR WITH coVeR RAIls
A.
Your greenhouse cover comes in one complete piece. You may find it easier to fit the cover over the frame
by partially opening the door zippers.
B.
Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of
overhang at all four corners.
C.
Inside the greenhouse, place a bungee cord fastener through each grommet hole and loop around the pipe
of the roof frame. Secure elastic around ball.
D.
Disassemble cover rails and slide them through the fabric pockets at each leg. Reattach with clamps
to each leg. Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts
completely.
E.
Check and tighten cover rails monthly to ensure the cover is tight.
A
B
d
c
Inside view of Cover
= Bungee fastener locations
10115
Cover
Rail
13202
Leg
01011
07000
Cover Rail Clamps