ShelterLogic GrowIT 70635 Assembly Instructions Manual Download Page 7

05_70635_0A

Page 7

6. InsTAllInG coVeR WITH coVeR RAIls

A. 

Your greenhouse cover comes in one complete piece.  You may find it easier to fit the cover over the frame 

by partially opening the door zippers.

B. 

Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of 

overhang at all four corners.

C.

 Inside the greenhouse, place a bungee cord fastener through each grommet hole and loop around the pipe 

of the roof frame.  Secure elastic around ball.

D. 

Disassemble cover rails and slide them through the fabric pockets at each leg.  Reattach with clamps 

to each leg. Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts 

completely.

E. 

Check and tighten cover rails monthly to ensure the cover is tight.

A

B

d

c

Inside view of Cover

= Bungee fastener locations

10115

Cover 

Rail

13202

Leg

01011

07000

Cover Rail Clamps

Summary of Contents for GrowIT 70635

Page 1: ...shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE 150 Callender Road Watertown CT 06795 www shelterlogic com 1 800 524 9970 1 800 559 6175 C...

Page 2: ...ce number listed below Please refer to the warranty card inside this package Prior to installation consult with all local municipal codes regarding installation of temporary shelters Choose the locati...

Page 3: ...Foot Plates Bungee Cords Bolts 1 4 x 1 5 8 in 6 4 x 41 3 mm Washer 1 4 in 6 4 mm Wing Nut 1 4 in 6 4 mm 6 4 2 2 8 2 3 2 3 4 1 4 8 11 4 33 802860 802897 801072 801073 13202 800179 802863 800178 802864...

Page 4: ...60 802860 802860 802860 802860 802860 3 Way Connections 07000 07000 03032 03032 801071 802860 801071 802864 802863 802863 802863 802864 802864 802864 801071 801071 801071 801071 07000 10115 802863 802...

Page 5: ...tach legs with 1 7 8 inch bolts 03032 on one side of roof frame letting the other side of roof frame rest on the ground C Attach remaining legs with 1 7 8 inch bolts 03032 to the other side of the roo...

Page 6: ...nd rear of the frame measures 5 feet in width 5ft 4 ASSEMBLE COVER RAILS A Assemble the 2 cover rails using 800178 800179 B Place an assembled cover rail between each leg and secure them with cover cl...

Page 7: ...the greenhouse place a bungee cord fastener through each grommet hole and loop around the pipe of the roof frame Secure elastic around ball D Disassemble cover rails and slide them through the fabric...

Page 8: ...st hole tool Optional Place auger in hole and fill with cement B Thread cable provided through the eyelets of the Anchor as indicated in figure Secure the cable with the clamps provided WARNING Seriou...

Page 9: ...e side vents as shown below Bolts are not used for these connections B Insert assembled vent rails into pockets at the bottom of the vent covers on each side C To open side vents roll green vent cover...

Page 10: ..._0A Page 10 9 USING THE END PANEL VENTS A To open vents completely unzip the semicircular zipper B Roll the vent cover upward C Use the hook and loop strap to secure the vent cover in a rolled positio...

Page 11: ...n Modelo n 1 5 x 1 8 x 2 m Invernadero del Cultivador Org nico 70635 Herramientas recomendadas Antes de empezar se recomiendan 2 o m s personas para ensamblar el tiempo aproximado de ensamble son 2 ho...

Page 12: ...ta de garant a dentro de este empaque Antes de su instalaci n consulte todos los c digos municipales locales con respecto a la instalaci n de toldos temporales Elija la ubicaci n del toldo cuidadosame...

Page 13: ...de Ala 1 4 pu 6 4 mm 6 8 1 4 8 11 4 33 802860 13202 801074 802916 10066 10115 01011 07000 4 4 4 Pernos 1 4 x 1 7 8 pu 6 4 x 47 6 mm 03032 22 10014 10016 801138 Postes Verticales 37 11 16 pu 95 7 cm C...

Page 14: ...es Conexiones de 3 v as Las Conexiones de Tuber as Swedged Las cabezas de perno deben de dar hacia afuera para evitar da os a la cubierta NOTA 802860 802860 802860 802860 802860 802860 07000 07000 030...

Page 15: ...piernas con 1 7 8 pulgada pernos 03032 en un lado del marco de la azotea Dejar que el otro lado del marco del techo del resto en el suelo C Adjuntar restantes piernas con 1 7 8 pulgada pernos 03032 de...

Page 16: ...e estas conexiones a mano sin excesivo rigor 4 adjuntar LOS CARRILES DE cubierta A Coloque los largueros de cubierta uso 800178 800179 B Coloque una tapa montada al carril entre cada pierna y seguro c...

Page 17: ...iar a trav s de cada agujero del ojal y el lazo alrededor del poste del marco de la azotea Asegure el el stico alrededor de bola D Desmonte los carriles de la cubierta y resb lelos a trav s de los bol...

Page 18: ...un tubo o barra de acero de de pulgada 1 9 cm a trav s del ojal de la barrena y el tornillo de anclaje en la tierra hasta que el ojal sobresalga del suelo de 1 a 2 pulgadas 2 54 cm a 5 08 cm por lo q...

Page 19: ...os pernos no se utilizan para estas conexiones B El inserte los carriles montados del respiradero en los bolsillos en la parte inferior de las cubiertas del respiradero en cada lado C Para abrir respi...

Page 20: ...ROS DEL PANEL DE EXTREMO A Para abrir respiraderos desabroche totalmente la cremallera semicircular B Ruede la cubierta del respiradero hacia arriba C Use la correa del gancho y lazo para asegurar la...

Reviews: