background image

05_51351_0B

Page 5

sTep 4 InsTAllInG Top RAIl

Install top cross rail assembly starting with (1) 02031 Plain Cross Rail Tube UNDER the last bow and on TOP 

of all the middle bows. End with the plain end of the Cross Rail Tapered End UNDER the front bow. 

 

 

 

 

 

 

noTe:

Use the Special Round Head      

1/4" x 3" Bolts for securing the top 

rail to the Middle Ribs only!

sTep 5 ATTAcHInG & secURInG BAse FeeT

Depending on the model you have purchased, your base feet will either fit onto the outside of the leg poles, 

or slide inside the leg poles. After installing Base Feet Plates onto the bottom of Middle Leg Poles, be sure to 

line up the pre-drilled hole in the leg with the pre-drilled hole in the base foot. Insert 1/4" x 2" bolts all the way 

through laeg and foot, to the other side, secure with bolt.

sTep 6 AncHoR sHelTeR  
w/ AUGeR AncHoRs for 
dIRT sURFAces

You will secure the anchors to the corner leg bends using 

the cable and clamp. Be sure to put cable through the hole 

in the corner leg bend, and through eye of anchor, secure 

clamp. Repeat process attaching the remaining anchors to 

the middle ribs with the cable around the upright above the 

foot plate.

noTe:

Anchors must be placed 

inside of shelter!

End Rib Anchors

NOTE:

15" Augers are for temporary use only!

For best results ShelterLogic recom-

mends using our Easy Hooks (#10036 

4-pack, #10035 6-pack, or #10038 

8-pack) or 30" Augers (#10075 4-pack, 

#10078 6-pack, or #10079 8-pack) for a 

stronger, more secure

installation.

Call 1-800-524-9970

or visit

www.shelterlogic.com 

for more information.

Summary of Contents for 51351

Page 1: ...ly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE 150 Callender Road Watertown CT 06795 www shelterlogic com 1 800 524 9970 1 800 559 6175 Canada Recommended Tools 11 11 10 12 W x 20 L x 10 H Run in Shed Assembly Instructions Description Model 12 W x 20 L x 10 H Run In Shed 51351 ...

Page 2: ...lterLogic LLC Shelters offer storage and protection from damage caused by sun light rain tree sap animal bird excrement and light snow Please anchor this ShelterLogic LLC structure properly See manual for more anchoring details Proper anchoring keeping cover tight and free of snow and debris is the responsibility of the consumer Please read and understand the installation detail warnings and cauti...

Page 3: ...before assembly Assembly Reference Mfg Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 100224 10225 10226 10273 10223 02030 02031 10205 10110 10111 10112 00669 10210 10114 10115 10270 800260 150 Callender Road Watertown CT 06795 www shelterlogic com frame assembly overview 12 W x 10 H ...

Page 4: ...orner upright tube Place 2 10112 3 way Connectors around the bent corner leg Insert the end of a 10110 Cover Rail Tube into the 3 Way Connector and fasten these with a 1 4 x 1 5 8 Bolt and Nut Slide the connector until it is 5 up from the ground and loosely tighten Repeat at the bent corner 3B Attach 10111 4 Way Connector to the end of the 2 Cover Rail Tubes and loosely fasten with a 1 4 x 1 5 Bol...

Page 5: ...e drilled hole in the base foot Insert 1 4 x 2 bolts all the way through laeg and foot to the other side secure with bolt STEP 6 ANCHOR SHELTER w AUGER ANCHORS for DIRT SURFACES You will secure the anchors to the corner leg bends using the cable and clamp Be sure to put cable through the hole in the corner leg bend and through eye of anchor secure clamp Repeat process attaching the remaining ancho...

Page 6: ...to end remove the cross rails and connectors on oen side of them fram and place them into the pockets between the cutouts Atach the crossrail using the 3 way and 4 way cover rail clamps around the uprights and loosely fasten with the 1 4 x 1 5 8 bolts and 1 4 nuts Check that the rails are evenly spaced above the ground on both sides Push down on the connectors one at a time to tension the cover an...

Reviews:

Related manuals for 51351