Step 2: Arch No.2, No.3
Page 1: ...ctions RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before yo...
Page 2: ...bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER We are not responsible...
Page 3: ...Purlins 15 5 Tension Pipe 2 6 Bracing Pipe 4 7 The Front Wall Rail 1 8 Hangar Rod 1 9 Pulling Rod 1 10 Upright for Back Wall 1 11 Upright for Back Wall 1 12 Middle Rails for Back Wall 2 13 Tension Pip...
Page 4: ...back wall 52 6 21 Bolt M10x30mm for Connection Plate 4 2 22 Bolt M10x60mm for Connection Plate 4 2 23 Bolt M8x50mm for Bracing Pipe 8 2 24 Pipe Clip 60 8 25 Tension Strap 32 1000mm 8 2 26 Plastic Plug...
Page 5: ...Page 5 INSTALLATION PROCESS Base Plate Installation Please refer to the diagram below to mark the position of base plates Frame Installation Step 1 Arch No 1 Front Wall...
Page 6: ...Page 6 Step 2 Arch No 2 No 3...
Page 7: ...Page 7 Step 3 Arch No 5 Back Wall...
Page 8: ...Page 8 Step 4 Purlins and Sidewall Bracing Tubes Step 5 Squaring Up The Frame and Install Stake Pegs...
Page 9: ...Page 9 Cover Installation Front Cover and Front Door Back Cover...
Page 10: ...Page 10 Roof Cover Now your assembly is completed...