
15 |
P a g e
INSTALLATION
I
NSTALLATION
P
ROCEDURE
C
HECKLIST
For installing the unit in a new workspace location.
Pre-Installation
Verify a CO
2
gas supply source suitable for your application is
available and can be connected to the incubator, page 9.
Check that the required ambient conditions for the unit are met,
page 16.
Check that the spacing clearance requirements are met, page 16.
•
Unit dimensions may be found on page 55.
Check that a suitable electrical outlet and power supply is present,
page 17.
Install the incubator in a suitable location
Review the lifting and handling instructions, page 18.
Install the unit leveling feet, page 18.
Install the incubator in its workspace location, page 19.
Set up the incubator for use
Clean and disinfect the unit and accessories, page 19.
Install the ceiling air duct in the incubation chamber, page 20.
Install the shelving, page 21.
Connect the incubator to the CO
2
gas supply source, page 22.
Verify that the silicone stopper is installed in the access port
inside the incubation chamber, page 23.
Fill the water jacket with 19 gallons (72 liters) of water, page 23.