
20 |
P a g e
INSTALLATION
I
NSTALL THE
C
HAMBER
C
EILING
A
IR
D
UCT
Note:
Exercise caution to avoid striking the sensors and blower fan wheel on the chamber ceiling when
installing the duct.
Note:
The incubator must be turned off and unplugged when carrying out this procedure.
Install the ceiling air duct to ensure the even flow of air throughout
the incubation chamber space. The incubator will not meet its
temperature uniformity specification without the air duct.
Perform the following steps to install the ceiling air duct.
Place the duct in the chamber.
•
The back of the duct should be placed toward the rear of the
chamber.
•
The mounting legs on the sides of the duct should be next to
the left and right chamber walls and point down toward the
chamber floor.
Move the air duct up to the top of the chamber.
Carefully seat the duct mounting legs in the shelf-
standard clips.
Back
Step 2
Front
Step 1
Step 3
Chamber Ceiling Air Duct
Back
Front