27
VC-H992U
VC-H992U(A)
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the point
1
as
shown below.
2. Install, paying attention to insert point
5
and release
point
3
.
3. For the phase matching at the insert point
1
, see the
point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
2
Insert
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
3
Insert
point
4
Insert
point
5
Release
point
3
Phase-matching
point
1
Shaft
1
Shaft
1
Shaft
4
Insert
point
2
Rotation
point
2
Summary of Contents for VC-H992U
Page 5: ...5 VC H992U VC H992U A 1 3 LOCATION OF MAJOR COMPONENTS AND CONTROL ...
Page 50: ...VC H992U VC H992U A 50 8 BLOCK DIAGRAM SYSTEM SERVO BLOCK DIAGRAM ...
Page 51: ...VC H992U VC H992U A 51 ...
Page 52: ...VC H992U VC H992U A 52 SIGNAL FLOW BLOCK DIAGRAM ...
Page 54: ...VC H992U VC H992U A 54 POWER CIRCUIT BLOCK DIAGRAM ...
Page 57: ...VC H992U VC H992U A 57 7 8 9 10 11 12 13 ...
Page 59: ...VC H992U VC H992U A 59 7 8 9 10 11 12 13 ...
Page 61: ...VC H992U VC H992U A 61 7 8 9 10 11 12 13 ...
Page 63: ...VC H992U VC H992U A 63 7 8 9 10 11 12 13 ...
Page 65: ...VC H992U VC H992U A 65 PWB FOIL PATTERN OPERATION PWB A B C D E F G H 1 2 3 4 5 6 7 ...
Page 66: ...VC H992U VC H992U A 66 A B C D E F G H 1 2 3 4 5 6 7 MAIN PWB ...