28
VC-A415U/H815U
VC-H817U/H818U
Figure 4-43.
4-23. INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the Phase-Match-
ing point
1
as shown below.
2. Install, paying attention to insert point
5
and release
point
3
.
3. For the phase matching at the insert point
1
, see the
Phase-Matching point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
2
Insert
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
3
Insert
point
4
Insert
point
5
Release
point
3
Phase-matching
point
1
Shaft
1
Shaft
1
Shaft
4
Insert
point
2
Rotation
point
2