
10
7.4
Insertion mounting
Observe the manufacturer‘s instructions for the mount-
ing system. Use the earthing holes for the potential
equalisation.
Although edge-to-edge mounting is possible (see also
Ch. 5
.4.1: „Intervals between PV modules with stand-
ard
frames“), we recommend mounting at intervals.
7.5
Load levels
A load can be a pressure load as well as a suction
load. Loads from snow and wind need to be taken into
account at the installation site.
The maximum permissible load is 2400Pa (for wind
and snow) when mounting the modules by using
crews, clamps or insertions systems
If there is a risk of sliding snow, an appropriate meas-
ure has to be taken so that PV module frames on lower
edge of PV modules will not be damaged (e.g. by
using snow hook).
The PV modules have passed a snow load test in
accordance with IEC61215.
7.6
Mounting drawings for modules
7.6.1
Maximum load 2400Pa (wind/ snow)
Fig. 9a Mounting drawings for load level 2400Pa
All dimensions are shown in mm. Permissible clamping area shown as red crosses.
Note1: Drawings are not always true to scale. The numerical values are binding.
7.6.2
Tested snow load (The modules have passed the test in accordance with IEC61215. )
990
4
3
0
8
0
0
4
3
0
1660
4
3
0
4
30
min 100
max 465
min 100
max 465
Clamping
Long frame side,
horizontal / vertical
Bolting
horizontal / vertical
In-Lay system
Long frame side,
horizontal / vertical
fr
am
e
t
h
ic
kn
es
s:
50
mm
Lo
ad
2
4
0
0
Pa
fr
am
e
t
h
ic
kn
es
s:
40
mm
Lo
ad
2
4
0
0
Pa