MX-CF10 MAINTENANCE 7 - 1
[7] MAINTENANCE
1. Maintenance list
Sequence of the maintenance works
The work sequence numbers are marked to the maintenance works on the maintenance list in the following three divisions.
• Large division
• Middle division
• Small division
Follow the above work sequence for efficient maintenance.
✕
: Check (Clean, replace, adjust, or grease as needed.)
❍
: Clean
▲
: Replace
Δ:
Adjust
✩
: Lubricate
❏
: Shift position
[Note 4] Replacement reference: For replacement, refer to the inserter paper feed port counter value.
• Paper feed roller related section: 150K or 1 year
• Torque limiter: 400K
[Note 7] Check when jams occur frequently.
[Note 8] Grease when noises are generated.
[Note 9] Check when noises are generated.
[Note 10] Check when a trouble or a jam is generated due to a sensor or a detector.
Work sequence number
Division
Description
*1
Work sequence for a section/unit
Large division
Indicates a section/unit to be worked.
*2
Work sequence for a sub unit
Medium division
Indicates the work sequence of the sub units in a section/unit.
*3
Work sequence of parts
Small division
Indicates the work sequence of the parts in a section/unit.
Unit name
Work
sequence
(Sub unit)
(*2)
Section/
Sub unit
name
Work
sequence
(Parts)
(*3)
Part name
When
calling
300
K
600
K
900
K
NOTE
Process / Material
Inserter
1
Transport
section
1
Transport rollers
✕
❍
❍
❍
Wipe with cloth
immersed in
water to clean.
2
Transport paper
guides
❍
❍
❍
❍
Ethyl alcohol
2
Paper feed
separation
section
3
Pickup roller/
Paper feed
rollers
✕
❍
❍
❍
[Note 4]
Wipe with cloth
immersed in
water to clean.
4
Torque limiter
✕
✕
✕
✕
[Note 4]
[Note 7]
3
Other
5
Sensors
✕
✕
✕
✕
[Note 10]
4
Drive
section
6
Gears
✕
✩
✩
✩
(Specified
position)
[Note 8]
FLOIL G5000H
7
Belts
✕
✕
✕
[Note 9]
5
2
5
5
1
7
4
7
6
1
3
2
5
5