
2-1-1
H9641MEN
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
STANDARD MAINTENANCE
Notes:
1. Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2. After cleaning the parts, do all DECK ADJUSTMENTS.
3. For the reference numbers listed above, refer to Deck Exploded Views.
Cylinder Assembly
Loading Motor Assembly
Pulley Assembly
Tension Lever Assembly
ACE Head Assembly
Reel(SP)(D2), Reel(TU)(D2)
Capstan Motor
Cap Belt
FE Head
Idler Gear, Idler Arm
Pinch Arm(A) Assembly
M Brake(SP) Assembly
M Brake(TU) Assembly
Ldg Belt
Cam Holder Assembly
B2
B3
B8
B587
B31
B573, B574
B37
B52
B73
B133, B134
B410
B414
B416
B525
B593
Deck
Periodic Service Schedule
Ref. No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
: Cleaning
: Replace
H: Hours