21V-FW100S
5 – 16
ADJUSTMENT
ITEM
ADJUSTMENT
POSITION
CONTOROL
PRE-ADJUST
REQUIREMENT
CONTENT
INPUT
CONDITION
OUTPUT
ADJUSTMENT
PROCEDURE
MODEL
21V-FW100S
SYMBOL
ˉ
AFTER ALL ADJUSTMENT FINISHED.
US 4 CH LION HEAD (MONOSCOPE PATTERN)
MODEL NAME
X-RAY PROTECTION OPERATING CONFIRMATION
ˉ
STEP RANGE
ˉ
21V-FW100S
AC 220V, RF INPUT
CONFIRMATION BY THE CRT
[VOLTAGE COMFIRMATION]
SET THE USER CONTROL TO SHIPMENT POSITION.
[VOLTAGE CONFIRMATION]
CHECK THE VOLTAGE OF C602 +VE TERMINAL AS SPECIFIED BELOW.
[OPERATION CONFIRMATION]
SUPPLY THE DC VOLTAGE TO C602 +VE TERMINAL AND MAKE SURE THE PROTECTOR IS
FUNCTIONED , HORIZONTAL OSCILATION STOP AND PICTURE DISAPPEAR.
[RECOVER INFORMATION]
PULL OUT THE AC CORD .
[CAUTION]
FROM THE RECOVER CONFIRMATION MENTIONED ABOVE,THE AC CODE MUST BE PULLED
OUT AT LEAST 4 SECOND BEFORE PLUGGING IN AGAIN. (IN ORDER TO MAKE SURE THE -COM
HAS BEEN RESET.)
TP VOLTAGE
OPERATION VOLTAGE
HISTORY
OF REVISION
REVISED CONTENT .
26 ± 1.1V DC
27V
Summary of Contents for 21M-FG1L
Page 34: ...21V FW100S 8 2 2 BLOCK DIAGRAM MAIN UNIT A C B D E F G H 2 10 9 8 7 6 5 4 3 1 21V FW100S ...
Page 35: ...21V FW100S 8 3 ...
Page 38: ...21V FW100S 10 2 2 SCHEMATIC DIAGRAM MAIN UNIT A C B D E F G H 2 10 9 8 7 6 5 4 3 1 21V FW100S ...
Page 39: ...21V FW100S 10 3 ...
Page 41: ...21V FW100S 11 2 2 PWB A MAIN UNIT Chip Parts Side ...
Page 42: ...21V FW100S 11 3 3 PWB B CRT UNIT Wiring Side ...
Page 43: ...21V FW100S 11 4 4 PWB B CRT UNIT Chip Parts Side ...