8
PURITY ADJUSTMENT
ADJUSTMENT POINT
ADJUSTMENT CONDITION / PROCEDURE
WAVEFORM OR OTHERS
1
NO
PURITY ADJ.
(1)
Receive the GREEN -ONLY signal. Adjust the
beam current to ~700
µ
A (21"&20")/
~500
µ
A(14").
(2)
Maintain the purity magnet at the zero
magnetic field and keep the static convergence
roughly adjusted.
(3)
Observe the points a, b, as shown in Fig. 1-1
through the microscope. Adjust the landings to
A rank requirement.
(4)
Orient the raster rotation to 0 eastward.
(5)
Tighten up the deflection coil screws.
Tightening torque : 108N
±
20N (11Kgf
±
2Kgf)
(6)
Make sure the CRT corners landing meet the
A rank requirements. If not, stick the magnet
sheet to correct it.
Note :
This adjustment must be done after
warming up the unit for 30 minutes or longer
with a beam current over 700
µ
A.
(For 14", the beam current should be over
500
µ
A).
Fig. 1-1
Fig. 1-2 Rank A (On the right of CRT)
Fig. 1-3 Rank A (On the left of CRT)
a
A
A=B
B
A
A=B
B
b
CONVERGENCE ADJUSTMENT
ADJUSTMENT POINT
ADJUSTMENT CONDITION / PROCEDURE
WAVEFORM OR OTHERS
1
NO
CONVERGENC
ADJ (To be
done after the
purity
adjustment.
(1)
Receive the "Crosshatch Pattern" signal.
(2)
Using the remote controller, call NORMAL
mode.
(Static convergence)
(1)
Turn the 4 - pole magnet to a proper opening
angle in order to superpose the blue and red
colours.
(2)
Turn the 6 - pole magnet to a proper opening
angle in order to superpose the green colour
over the blue and red colours.
(Dynamic convergence )
(1)
Adjust the convergence on the fringes of the
screen in the following steps.
a)
Fig. a :
Drive the wedge at point " a " and swing
the deflection coil upward.
b)
Fig. b :
Drive the wedge at point " b " and " c " and
swing the deflection coil downward.
c)
Fig. c :
Drive the " c " wedge deeper and
swing the deflection coil rightward.
d)
Fig. d :
Drive the " b " wedge deeper and swing the
deflection coil leftward.
(2)
Fix all the wedges on the CRT and apply glass
tape over them.
(3)
Apply lacquer to the deflection yoke lock
screw, magnet unit (purity, 4 - pole, 6 - pole
magnets) and magnet unit lock screw.
Finally received the Red - only and Blue - only
signals to make sure there is no other colours
on the screen.
Fig. a
Fig. b
Fig. c
Fig. d
R G B
R
G
B
CRT NECK
Lacquer
Purity Magnet
4-Pole Magnet
6-Pole Magnet.
20cm
40cm (14")
(21")
B
G
R
B G R
R G B
B
G
R
B G R
R
G
B
Wedge "a"
Wedge "b"
Wedge "c"
About
100 Deg
About
100 Deg
Lacquer
Summary of Contents for 20GT-15
Page 23: ...21 20GT 15 CHASSIS LAYOUT ...
Page 24: ...20GT 15 20GT 15 22 23 BLOCK DIAGRAM MAIN UNIT BLOCK DIAGRAM ...
Page 25: ...20GT 15 24 CRT BLOCK DIAGRAM ...
Page 26: ...25 20GT 15 WAVEFORMS ...
Page 30: ...29 20GT 15 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 CRT UNIT ...
Page 34: ...20GT 15 36 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 PWB B CRT UNIT ...