SHADE SCAPES AMERICAS PARAFLEX 150 LB SHELL BASE KIT Installation Manual Download Page 2

PXSB-­‐SS2013.01

  B  

MOUNTING INSTRUCTIONS

1:                                                                                                                

  

(a) Place the Paraflex 150/250 LB Shell Base (B1) upside 
down on a flat and level surface. To protect the finish from                          
scratches, place a piece of cardboard underneath it.                                                                                                                  
NOTE: A sticker has been placed over  each of the holes 
without Concrete Studs (B3). Leave these stickers in place.  
DO NOT REMOVE the pre-installed Concrete Studs.                                                                                              
(b) Place a piece of masking tape over the hole in each 
Concrete Stud. Use a Carpenter's Level to ensure the                        
Paraflex 150/250 LB Shell Base is level. If necessary shim                          
with pieces of cardboard until level.

The manufacturer warrants to the consumer that the 150/250 LB Shell Base Kit is free from manufacturer defects in material or workmanship for
a period of three (3) years from the date of original purchase when used in compliance with directions as outlined in the manufacturer’s
instructions, which includes reasonable and necessary maintenance by the consumer. Warranty does not include normal wear and tear of product.
Manufacturer takes no responsibility for incorrect use or assembly related to installation area, consistency of supports and relative hardware used, 
and capacity of mounting surfaces. Failure to follow the given assembly, maintenance, use and care instructions will void the product warranty. In
case of manufacturing defects in material or workmanship, manufacturer agrees to, at their discretion, send the replacement part for all defective
parts.

Distributed   by   ShadeScapes   Americas                                                                                                                                                                                                                                                                                                                                                                                                            
www.shadescapesamericas.com;   888.217.4446                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  
For   assembly   assistance   or   questions   please   contact   ShadeScapes   Americas   at   888.217.4446,   or   email   [email protected]

2

3:

                                                                                

                               

(a) After allowing the concrete to thoroughly dry (at least 48 
hours in a sunny area), turn the Paraflex 150/250 LB Shell 
Base (B1) over. Remove the Flat Head Machine Screws (B2).                                                                                                                                                                                                      

IMPORTANT:  The concrete must be completely dry before 
turning the Paraflex 150 LB or 250 LB Shell Base over. 
Concrete can take up to 4 days to dry in cool climates. For 
best results, complete this process outside in a warm, sunny 

  C  

WARRANTY

NOTE:      For   maximum   stability,   the   Paraflex   150/250   LB   Shell                                                                  
Base   should   be   placed   on   flat,   level   ground.

2:                                                                                                                

                      

(a) Depending on which base you purchased, mix either150 LB, or 
250 LB of concrete in a wheelbarrow following the instructions on 
the packaging of the concrete mix.                                                                                                 
(b) Carefully fill the Paraflex 150/250 LB Shell Base (B1) evenly 
until the concrete is flush with the rim. This may not require the full                           
150, or 250 pounds of mixed concrete. Do not fill above the rim. 
Immediately clean any over-spill on the exterior with a moist cloth 
before the concrete begins to set and dry.  Over-spill can damage 
the finish.                                                                        

        

Reviews: