
PAGE 13
PAGE 12
STARTING THE GENERATOR - PULL START
5. Switch the engine switch
to the ‘on’ position.
6. Pull the pull starter cord
lightly, until it tenses, then
pull briskly.
7. Once generator engine
starts, move choke lever
over to the right
.
THE GENERATOR SHOULD REQUIRE ONLY ONE
OR TWO PULLS TO START. Otherise please contact
SGS Engineering on 01332 576 850.
STARTING THE GENERATOR - ELECTRIC START
1. Disconnect all
equipment cables from the
230 V and 115 V outlets.
2. Turn the circuit breaker to
the ‘off’ position.
3. Turn the fuel tap down-
wards, this means the fuel
supply is ‘on’.
4. Turn the choke to the
‘left’ position.
WWW.SGS-ENGINEERING.COM
CALL FOR ASSISTANCE:
01332 576 850