SGE sge-353 User Manual Download Page 8

Qualified personnel

Caution

Means hazard of electric shock and failure to take the necessary safety precautions will result in
death, serious injury or considerable material damage.

Installation and operation of this equipment described in this manual may only be performed by
qualified personal.
Only people that are authorized to install, connect and use this equipment and have the proper
knowledge about labeling and grounding electrical equipment and circuits and can do so
according to safety and regulatory standards are considered qualified personnel in the manual.

Subject to technical modifications without notice.

General Warning

After removing the packaging make sure the integrity of the unit. If in doubt don't use the
equipment and contact technical staff.
Mounting of electric appliances must be carried out only by skilled electricians. It is imperative to
observe the generally applicable safety measures.

In case of failure and /or malfunctioning of the device, turn off it. For any repair only contact
technical staff. Failure to comply with the above may compromise the device safety.

Warranty

The manufactory will repair or exchange the products while the lead seal is still exited, within 12
months, when discovering the products not accordance with the technical specification.

Technical support

For any problems of our products please contact:

Summary of Contents for sge-353

Page 1: ......

Page 2: ...meter has the function to memorize all the data when the power off When the machine is switched on again after the power off the measurement data should continue running on and show the summing up amo...

Page 3: ...set the energy you must select the current reset page to operate Key2 Key4 Enter into set interface Key3 Key4 Starting up to check the meter password Material Case Grey flame resistant ABS Panel Grey...

Page 4: ...1 14 Voltage Ua Ub Uc 2 14 Current Ia Ib Ic 3 14 Power Pa Pb Pc 4 14 React Power Qa Qb Qc 5 14 Act Power Sa Sb Sc 6 14 Voltage Uab Ubc Uca 7 14 P F PFa PFb Pc 8 14 THD current THD Ia THD Ib THD Ic 9 1...

Page 5: ...t primary 0 99999A Secondary 5A Page 3 ID Meter communication address broadcast address 0 1 255 Page4 Baud Baud rate 1200 to 9600 Page5 MD period Select time 1 30min Page6 Password Change password XXX...

Page 6: ...the panel meter to relative position see Fig 3 Fig 3 Then install these two black clips back to the panel meter two sides should be strictly installed see Fig 4 Making the connection according to the...

Page 7: ...ve the instruction can result in death serious injury or considerable material damage Safe carrying capacity of rubber or plastic insulated wire 1 specification mm nominal cross section mm2 Safe carry...

Page 8: ...t to technical modifications without notice General Warning After removing the packaging make sure the integrity of the unit If in doubt don t use the equipment and contact technical staff Mounting of...

Reviews: