Page 1: ......
Page 2: ...meter has the function to memorize all the data when the power off When the machine is switched on again after the power off the measurement data should continue running on and show the summing up amo...
Page 3: ...set the energy you must select the current reset page to operate Key2 Key4 Enter into set interface Key3 Key4 Starting up to check the meter password Material Case Grey flame resistant ABS Panel Grey...
Page 4: ...1 14 Voltage Ua Ub Uc 2 14 Current Ia Ib Ic 3 14 Power Pa Pb Pc 4 14 React Power Qa Qb Qc 5 14 Act Power Sa Sb Sc 6 14 Voltage Uab Ubc Uca 7 14 P F PFa PFb Pc 8 14 THD current THD Ia THD Ib THD Ic 9 1...
Page 5: ...t primary 0 99999A Secondary 5A Page 3 ID Meter communication address broadcast address 0 1 255 Page4 Baud Baud rate 1200 to 9600 Page5 MD period Select time 1 30min Page6 Password Change password XXX...
Page 6: ...the panel meter to relative position see Fig 3 Fig 3 Then install these two black clips back to the panel meter two sides should be strictly installed see Fig 4 Making the connection according to the...
Page 7: ...ve the instruction can result in death serious injury or considerable material damage Safe carrying capacity of rubber or plastic insulated wire 1 specification mm nominal cross section mm2 Safe carry...
Page 8: ...t to technical modifications without notice General Warning After removing the packaging make sure the integrity of the unit If in doubt don t use the equipment and contact technical staff Mounting of...