Seven Trust WPC Pergola Installation Manual Download Page 5

Shanghai Seven Trust Industry Co., Ltd.

[email protected]

* 80mm Crossbeam and fix the lattice with 5 * 60 round base screws.

10.

Complete all assembly.

Please Note:

1.The bottom of the post can not be closed. If closed, please drill a Φ

5mm drainage hole at the bottom .

2.Drill Φ15mm drainage hole at the slot of the beam.

3. Beams length should be controlled within 3000mm between the 2 posts.

Reviews: