
WOOD BOILER INSTRUCTIONS Page 20 Copyright © 2011 Seton Wood Boilers all rights reserved
This is the best method to install a chimney on the Seton Boiler.
CHIMNEY CONNECTIONS
The chimney used for the boiler must not be used to ventilate the cellar or basement. If there is a
cleanout opening in the base of the chimney, close it tightly.
Listed chimney
Carefully follow chimney manufacturer’s instructions. Use only a listed chimney. If your chimney
starts at the ceiling, you will need enough 8” round black stove pipe to reach the ceiling. The top of
the chimney must be at least three (3) feet above the roof and be at least two (2) feet higher than any
point of the roof within ten (10) feet.
If you have any questions regarding venting your boiler, contact the manufacturer or contact the Na-
tional Fire Protection Association (NFPA) and request a copy of the latest editions of NFPA Stan-
dard 211 and NFPA Standard 908. Their address is: Battery March Park, Quincy, MA 02269
8” SINGLE WALL STOVE PIPE
18 TO 20 FEET OF 8” INSULATED CLASS “A” CHIMNEY
8” INSULATED CLASS “A” TEE
8” INSULATED CLEANOUT
DO NOT USE A CHIMNEY CAP