5. Commissioning
22
3. Feed cable into connection box according to diagram below.
Make sure that the mains supply is switched off.
Use a suitable shutdown unit i.e. emergency switch.
L
N
PE
5
7
3
2
1
6
8
4
1
Terminal box
2
3 pin terminal
3
Control unit mains cable
4
Main supply
5
Conductor 1 (black)
To terminal L
6
Conductor 2 (black)
To terminal N
7
Conductor PE (yellow/green) To terminal PE
8
Shield
To terminal PE
4. Close the terminal box
5. The unit is ready for operation approximately 5 seconds after switching it on.
IMPORTANT!
Connect the shield to PE
Note:
The mains cable has a wire cross-section of 1.5 mm². The mains supply fuse protection should be set
accordingly.
The electronic board contains no alternating mains fuse.
5.2.7 Behaviour of machine at start up
Lamps and outputs during start-up phase:
Output
Contact status with parameter "Metal at power on = [ ]"
LED Operation / Fault
"off"
LED Metal
"off"
Metal relay
Contacts 71 and 72 closed (equal to no metal alarm)
Fault relay
Contacts 81 and 82 closed (consistent with fault status)
MV1 / MV2 / MV3 switching
outputs
High active or Low active, depending on system setup
Lamp interface
LM = Lamp metal
"on"
LB = Lamp operation "on"
LF =
Lamp fault
"on"
Mz = Metal counter "inactive"
LM, LB and LF „on“
Function test lamp in the start-up phase.