Sermatec Acrel ACR10R-D10TE4/C45 Installation Download Page 2

01

02

Eastron

  

Smart

 

Meter

 

is

 

designed

 

with

 

high

 

precision

small

 

dimensions

convenient

 

operation

 

and

 

installation

.

It

 

is

 

available

 

for

 

both

 

single

-

phase

 

and

 

three

-

phase

 

grid system

 

connection

 

to

 

detect

 

voltage

current

power and

 

energy

.

Any

 

fault

 

or

 

damage

 

caused

 

by

 

misoperation

 

or

 

disobeyal

 

against

 

the

 

rules

 

on

 

manual

 

is

 

beyond

 

Eastron 

 

warrenty cover

 

range.

INTRODUCTION

INSTALLATION

 

                                          

  

Only

 

suitable

 

for

 

RS

485 

cable

 

connection

 

on

  

RJ

45 

port

 

of

 

NOTE

:

sermatec

 

hybrid

 

inverters

.

Eastron 

 

Meter Installation 

Three

-

phase 

 

 

Model: SDM630MCT V2

(1)

Make

 

sure

 

AC

 

cable

 

is

 

totally

 

isolated

 

from

 

AC

 

power

 

before connecting

 

Meter

 

and

 

CT.

(2)

Incorrect

 

connection

 

or

 

direction

 

will

 

cause

 

incorrect

 

data

.

Main

 

Meter

Rs

485

A

Rs

485

B

BLOW FUSE

9   10   11  12  13  14  15  16  17   18  19  20  

       

S

0            

Rs485            Current Inputs

1       2        3       4        5       6        7       8

Voltage

 

Inputs                 L         N        L        N

1

A FAST

   

 

    N   L3   L2   L1  LA  NA

 

     (Black)

S2

S2

S1

S1

(White)

S2

S1

     (Black)

(White)

S2

S1

03

WIRING

 

FOR

 

THREE

-

PHASE

 

METER

(Model: SDM630MCT V2)

L1
L2
L3

N

L1 L2

L3 N

RS

485

R

S

4

8

5

Reviews: