Step 26  Install Front Gable Trim continued

I4

=($1'**%V@]EdIe%*,(0%EHF%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24

=($1'** 1"2 2(3 6#1" 1"2 8*)2 &'/M#(0 '1 1"2 /#3024 =($1'** EHF
9*)$" 6#1" 1"2 1,- ,9 1"2 /,,9 $"2'1"#(04 5$2 V3 0'*B4 ('#*$4

_4

=($1'**%VIe%*,(0%EHF%1/#&%8,'/3$%'1

1"2%$#32%,9%1"2%0'8*27%9*)$"%6#1"%1"2
/,,9%$"2'1"#(04

Blue Ends Together

82-1/4" long 1x6 Trim

82-1/4" long 1x6 Trim

F4

!"2/2%#$%(,%,B2/"'(0%,(%1"2%8'+M

0'8*24 Y--*. 1/#& 3#/2+1*. 1, 1"2 $#3#(0
9*)$" 6#1" 1,- ,9 [<; /,,9 $"2'1"#(04

Step 27  Install Door Trim

E4

=($1'** D]^dVe H VIe -/#&23 QR 3,,/ O'&8 &'12/#'* 1, 1"2 $#32$ ,9 1"2 3,,/ ,-2(#(04 =($1'** 3,,/

O'&8%9*)$"%6#1"%1"2%$#3#(04%5$2%V3%0'*B4%('#*$4

@4

=($1'**%K@L%16,%Ife%*,(0%EHI%1/#&%8,'/3$%6#1"%'(0*2%+)1$%'(3%'%EHF%M2.$1,(2%'+/,$$%1"2%1,-%,9

1"2 3,,/ ,-2(#(04 =($1'** 1"2 1/#& 8,'/3$ +2(12/23 '+/,$$ 1"2 ,-2(#(0 '(3 DdIe '8,B2 1"2 $#3#(04
!"2%2H-,$23%$#3#(0%6#**%$2/B2%'$%'%3,,/%$1,-%6"2(%1"2%3,,/$%'/2%+*,$234%5$2%V3%0'*B4%('#*$
$-'+23%E@e%'-'/14

1x6 Keystone

49" Door Trim

84" LP

Door Jamb

D

=($1'** K@L 16, EHI]VI]DdIe *,(0 1/#& 8,'/3$

9*)$" 1, 1"2 $#32$ ,9 1"2 3,,/ ,-2(#(04 !'+M
1"2$2 8,'/3$ 6#1" ' +,)-*2 ('#*$7 .,) &'.
6'(1 1, /2-,$#1#,( 1"2 1/#& 6"2( .,) #($1'**
1"2 3,,/$4 !"2 $-'+2 '/,)(3 1"2 3,,/$ 6#**
(,1 82 2B2( =9 .,)/ 3,,/ ,-2(#(0 #$ ,)1 ,9
$N)'/24 J,) +'( /2&,B2 '(3 /2-,$#1#,( 1"2
$#32 1/#& 1, &'M2 '**,6'(+2$ 9,/ 1"#$4 J,)
+'(%&,B2%1"2%1/#&%1,%&'M2%1"2%3,,/%$-'+#(0
2N)'*4%5$2%V3%0'*B4%('#*$4

Siding Extends

3/4" Below Trim

Summary of Contents for Virginia 16x24

Page 1: ...0 1 6 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 A A Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 Sentry Buildings 2B 23 C D7 A EFGH IG 3 0 Assembly B...

Page 2: ...1 1 2 62 6 2 M23 1 2 1 9 GYG 214 2 1 2 12 1 2 21 6 1 82 23 1 1 2 9 1 9 6 3 91 9 2 2123 T 0 82 9 1 2 9 1 9 6 3 91 9 7 2H12 3 07 91 9 0 3 9 2 1 0 6 82 32 B2 23 8 2 4 6 82 2 12 32 B2 3 6 82 1 9 23 829 2...

Page 3: ...12 3 B2 23 6 1 DdIe 1 0 2 3 0 B2 6 3 9 04 Foundation TypesX a 1 9 3 1 82 1 32 2 3 6 1 1 2 9 12 6 82 1 234 2 8 3 0 32 2 6 3212 2 6 1 1 2 9 9 3 1 82 234 Y 926 3 992 2 1 1 2 9 9 3 1 2 6 82 64 2 M 1 2 0...

Page 4: ...324 Treated Bottom Plate E4 1 K L 16 HI VG K 2 6 82 1 2 123L 1 2 01 9 f Ed e4 R 1 1 2 8 3 1 021 2 3 3 12 6 1 GgG M 6 2 2 1 2 6 1 3 6 82 1234 4 C M G G 6 2 2 821622 9 1 16 1 3 M 4 292 2 23 12 12 4 Note...

Page 5: ...16 EF3 0 B 23 32 M 4 5 2 K L 16 EA3 123 M2 2 1 3 1 2 2 1 2 1 124 D4 2 2 1 1 8 3 K_L 9 B2 2 VG 0 6 9 24 I4 C M 9 2 GSide Wall Frames 3 21 9 2 324 Step 3 Assemble Door Header 99 Long 2x8 48 OSB Filler...

Page 6: ...821622 2 32 3 1 HI 124 1 6 1 EA3 M2 1 0 1 12 3 1 2 1 2 32 4 B2 1 99 9 2H1 12 4 _4 Q 12 e 0 2 8 1 HI 6 3 6 2 32 3 KFL H IAe 0 HI 4 1 KEL 2 9 1 2 IAe 0 HI 1 2 01 9 e 3 1 12 6 82 64 5 2 KDL 1 22 IAe 0 H...

Page 7: ...2 3 M23 6 1 G G 1 2 4 2 2 9 2 1 021 2 1 1 2 2 0 KIL 9 EA3 M2 4 2 6 6 1 2 1 1 3 4 4 1 1 2 1 2 f Ed e 2 6 9 2 1 1 2 2 6 9 24 c 1 2 2 6 9 2 1 021 2 6 2 2 1 2 8 11 6 1 KVL 2 0 1 EA3 M2 K 1 002 2 32 9 1 2...

Page 8: ...9 0 EF3 U B4 Ie 2 12 4 212 8 1 4 S 1 1 2 HI 12 1 2 3 2 04 15 5 Front Wall Frame 8 Side Wall Frame 4 1 1 2 9 1 6 9 2 821622 1 2 32 6 9 2 4 1 2 6 9 2 3 9 6 1 1 2 6 3 6 123 1 2 0 14 2 2 9 2 1 021 2 1 1...

Page 9: ...6 4 5 2 EA3 M2 4 I4 1 1 9 1 3 1 HI E G 8 3 1 2 2 32 6 9 24 _4 2 2 1 1 1 HI 1 2 12 1 2 12 326 9 2 4 Back Wall Frames E4 1 EFG 0 HI 1 2 8 M 6 4 5 2 EA3 M2 2 EFe 1 1 2 2 1 2 12 4 4 2 2 1 1 1 EFG 0 HI 1...

Page 10: ...nstall Siding on Wall Frames continued D4 1 3 0 12 32 6 4 Cut remove 2x4 Plate I4 C2 0 9 1 2 G1 0 2G 23027 1 3 0 2 1 6 31 9 Ve4 1 1 3 0 2 1 2 9 1 6 6 1 1 2 G 1G 2302 9 6 1 1 2 3 0 1 2 32 6 4 1 3 2 B2...

Page 11: ...Step 12 Install Stairs Steps not needed with this size and model Step 9 thru 11 IMPORTANT Go now to the instructions in the stair kit book to install the stairs floor joist and flooring...

Page 12: ...t easier to stand the gable upright over the lower wall 2x4 Block 2x4 Block 71 3 8 Long Truss Leg 2x4 On Edge 97 1 2 Long 2x4 On edge 188 1 2 71 3 8 Long Truss Leg 81 3 4 Long Truss Top Truss Knee D4...

Page 13: ...1 2 1 3 2 84 26 8 11 9 2 1 HI 12 0 Ed e 26 4 2 2 1 2 VA Ed e 1 3 1 1 2 2 8 1 9 2 0 Ed e 26 4 Step 13B Assemble Rear Gable continued F4 1 _dVe 3 FI Ed e 6 1 3 1 2 291 32 9 1 2 0 8 2 9 24 5 2 N 2 1 2 2...

Page 14: ...B4 23 E e 14 Y 1 6 82 1 23 6 1 V3 0 B4 23 E e 14 1x4 Trim D4 1 K L 16 fFe 0 EHI 1 8 3 821622 2 8 3 4 3 82 9 6 1 1 2 91 9 4 1 3 8 3 1 9 14 I4 2 2 1 1 1 1 1 1 2 9 1 6 2 4 Siding Filler I4 1 VA Ed e 0 3...

Page 15: ...xtends Over Trim Paint edge Step 16 Install Rear Roof Gable 4 2 1 1 2 0 8 2 8 M 6 4 2 1 3 2 2 0 8 2 3 0 2H12 3 B2 1 8 M 6 4 2 12 0 8 2 6 1 8 11 HI 2H12 3 0 E Ed e 1 62 6 HI 8 1 32 4 c 1 9 0 EA3 M2 4 2...

Page 16: ...KEL 2 1 DFe4 R 1 1 2 2 8 3 6 82 64 C2 2 3 1 2 1 8 11 0 8 2 9 2 3 1 KDL 1 22 HI 1 1 2 01 3 1 32 DFe 8 34 1 HI 6 1 EA3 M2 4 36 Step 17 Assemble Install Front Gable Step 18 Install 2x6 Truss Plates Deta...

Page 17: ...8 2 1 4 5 2 3 M2 0 6 2 2 1 3 2 1234 D4 1 3 8 2 HF 99 1 8 M 32 1 2 0 8 2 2 1 2 2 4 1 1 2 2 8 M 9 6 1 1 2 9 2 9 1 2 0 8 2 3 04 1x3 Stripping 2x6 Soffit Block 2x6 Truss Plate 4 1 99 1 8 M 32 2 GgG 1 2 1...

Page 18: ...21 2 Ie 6 324 302 0 21 DE DdIe 6 324 Y 6 3 0 2 821622 1 2 0 21 3 1 2 HF 8 3 4 2 2 0 21 6 1 KDL 1 22 6 9 F3 23 Fe 14 ImportantX 6 2 1 0 1 2 0 21 1 1 2 M 227 1 0 21 6 1 1 2 12 1 0 23 32 1 6 3 1 2 3024...

Page 19: ...4 1 1 2 1 99 1 2 9 6 1 1 2 2 3 9 1 2 3 8 2 99 1 8 M4 D4 1 99 1 2 1 2 12 6 4 E4 1 HF 02 B2 1 2 GgG M 1 2 1 12 3 9 6 1 1 32 2302 9 HF4 5 2 E Ed e O 1 02 4 21 1 20 1 02 4 5 2 EA3 123 M2 1 2 2 1 2 1 1 1 2...

Page 20: ...2 2 M4 _4 1 99 1 2 1 9 1 9 6 1 1 2 8 11 HI4 8 Soffit Panels 8 Soffit Panel D4 1 K L 16 Ve 6 32 H IV DdIe 23 99 1 2 32 1 2 HI 6 1 23 32 3 6 3 1 2 GQYRG 2302 1 021 2 1 1 2 M 22 9 1 2 0 8 24 5 2 E EdIe...

Page 21: ...ng packed in Pallets 48 x59 Roof Sheathing 48 x83 Roof Sheathing Straight Edge Install this Row Second Gsble Knee Cut This Row to 36 Width 96 Long 96 Long 4 1 K L 16 IVeHfFe 221 9 1 M2 KIL 9 IVeHIVe 2...

Page 22: ...0 1 2 2 0 8 24 5 2 E EdIe 1 26 1 2 2 1 2 99 1 2 1 1 2 HI 4 5 2 3 M2 1 2 2 1 2 9 2 1 0 1 1 2 HI 4 4 2 1 3 2 2 V _dVe 0 HI 821622 1 2 99 1 2 3 1 2 9 2 1 0 1 2 32 9 1 2 0 8 24 2x4x81 3 4 2x4x82 5 8 2x4x...

Page 23: ...Door Trim E4 1 D dVe H VIe 23 QR 3 O 8 12 1 1 2 32 9 1 2 3 2 04 1 3 O 8 9 6 1 1 2 3 04 5 2 V3 0 B4 4 4 1 K L 16 Ife 0 EHI 1 8 3 6 1 0 2 1 3 EHF M2 1 2 1 2 1 9 1 2 3 2 04 1 1 2 1 8 3 2 12 23 1 2 2 0 3...

Page 24: ...1 9 02 3 1 1 32 1 6 1 e 26 4 _4 1 1 2 6 3 6 0 1 2 1 6 12 26 4 F4 1 3 3 2 1 1 2 2 3 23 2 0 1 32 3 4 a 2 1 2 3 2 1 23 1 2 32 1 6 3 3 234 0 12 21 26 1 9 4 E4 1 KDL 1 22 Fe 02 1 32 9 1 2 3 4 1 1 2 027 3 1...

Page 25: ...0 1 2 6 3 6 4 4 2 1 6 3 6 2 04 P 3 1 2 6 3 6 2 0 926 V3 0 B4 4 D4 11 EHD 1 8 3 0 2 32 9 1 2 6 3 67 9 6 1 1 2 1 9 24 2 EHD 32 1 6 2H12 3 D Ed e 82 6 1 2 6 3 6 9 2 1 2 2 B2 1 2 8 11 1 4 2 1 1 6 2 1 1 2...

Page 26: ...HF H VE DdIe 3 I 2 4 HF H E DdVe Q20 I 2 4 HF H EAe 99 1 M I 2 4 D e H EA Ed e 302 U 21 V 2 4 DAe H EE Ed e h 22 U 21 2 4 _ EdIe H IVe R 23 99 1 R 82 I 2 4 HF C21 P 02 F 2 4 HEA C21 P 02 E 8 F3 3 EA3...

Page 27: ...EV HF k 1 P 02 V HEA k 1 P 02 IA dEFe R 9 9 2 1 0 I EF 4 11 2 a 3 U 2 E EF 4 M Qty Material Shipped on A Pallet R 2 8 1 U 8 2 T 2 E DdIeH IVe R 2 8 1 U 8 2 T 2 Ef EdIeH IVe E R 2 8 1 HI S P2 32 HI D E...

Page 28: ...EAG S P2 32 D HEA VG T k 1 W P2 32 _ HEA E G T k 1 W P2 32 ED HEA EFG T k 1 E IHV DdIe WU Q 91 T 0 IHV DdVe QR R 23 3 0 EF IHV dEFe 2 1 0 Qty Stair Material Shipped on B pallet E DdIe H 12 1 02 EE dVe...

Reviews: